| Sign In | Join Free | My burrillandco.com |
|
...°, 45°, 60° LED Brand: CREE/Osram LED Type: 3535 Color Grey Scale: 65536 Power: 36W Working Voltage: DC24V Weight: 2.5KG Washing Height: ≤6m Control Method: DMX512 Operating Temperature: -40℃ to 50℃ Lifespan...
...°, 45°, 60° LED Brand: CREE/Osram LED Type: 3535 Color Grey Scale: 65536 Power: 24W Working Voltage: DC24V Weight: 1.5KG Washing Height: ≤6m Control Method: DMX512 Operating Temperature: -40℃ to 50℃ Lifespan...
...°, 45°, 60° LED Brand: CREE/Osram LED Type: 3535 Color Grey Scale: 65536 Power: 24W Working Voltage: DC24V Weight: 1.5KG Washing Height: ≤6m Control Method: DMX512 Operating Temperature: -40℃ to 50℃ Lifespan...
...ideal method to shorten clamping cycle and save clipping time when user meets the clamping requirement. Within 2 seconds this smart device can safely clamp work piece. Round Magnetic Chuck Technical Paramete...
...ideal method to shorten clamping cycle and save clipping time when user meets the clamping requirement. Within 2 seconds this smart device can safely clamp work piece. Round Magnetic Chuck Technical Paramete...
...: 120W Massage method: kneading / massage / airbag / vibration /warm / zero gravity, etc. Use weight: 0〜150KG Product model: YJ-L30 Working hours: 5/10/15/20/25/30min Product :N.W: 90KG/G.W110KG Applicable h...
.... 3. Put the hammer rod on from the sliding sleeve under the hammer seat, put the selected weight on the hammer rod, and tighten the nut. 4. Turn on the power and enter the working state. 5...
... placing boom is designed with such advanced design methods with lighter weight, better stability and smaller unfolding space The front “X” stabilizers single side working Pumping with huge displacement keep...
...ideal method to shorten clamping cycle and save clipping time when user meets the clamping requirement. Within 2 seconds this smart device can safely clamp work piece. Round Magnetic Chuck Technical Paramete...
...ideal method to shorten clamping cycle and save clipping time when user meets the clamping requirement. Within 2 seconds this smart device can safely clamp work piece. Round Magnetic Chuck Technical Paramete...
...(H) Minimum cleaning size 10mm(W)*10mm(H)Fixture Height of conveying surface from ground 900±50mm Working width 600mm transfer method Mesh belt conveyor transfer speed 10cm~150cm/min(adjust) Conveying direct...
...°, 45°, 60° LED Brand: CREE/Osram LED Type: 3535 Color Grey Scale: 65536 Power: 24W Working Voltage: DC24V Weight: 1.5KG Washing Height: ≤6m Control Method: DMX512 Operating Temperature: -40℃ to 50℃ Lifespan...
...°, 45°, 60° LED Brand: CREE/Osram LED Type: 3535 Color Grey Scale: 65536 Power: 36W Working Voltage: DC24V Weight: 2.5KG Washing Height: ≤6m Control Method: DMX512 Operating Temperature: -40℃ to 50℃ Lifespan...
...°, 45°, 60° LED Brand: CREE/Osram LED Type: 3535 Color Grey Scale: 65536 Power: 24W Working Voltage: DC24V Weight: 1.5KG Washing Height: ≤6m Control Method: DMX512 Operating Temperature: -40℃ to 50℃ Lifespan...
...°, 45°, 60° LED Brand: CREE/Osram LED Type: 3535 Color Grey Scale: 65536 Power: 24W Working Voltage: DC24V Weight: 1.5KG Washing Height: ≤6m Control Method: DMX512 Operating Temperature: -40℃ to 50℃ Lifespan...
... and easy operation; OEM available, same quality much lower price. prominent merit: 1. Z axis can enable customers to control the coils height 2. auto servo motor peeling device 1 set is equipped, so that it...
...: 120W Massage method: kneading / massage / airbag / vibration /warm / zero gravity, etc. Use weight: 0〜150KG Product model: YJ-L30 Working hours: 5/10/15/20/25/30min Product :N.W: 90KG/G.W110KG Applicable h...
...method Pendent line with press button /cabin/remote control Speed Hoisting m/min 8. 8/0.8 7. 7/0.7 3.5, 3.5/0.35 6. 6/0.6 Travelling of crab 20 Travelling of crane Surface 20(30) 20 Cabin 20(30) 20 Electric ...
... placing boom is designed with such advanced design methods with lighter weight, better stability and smaller unfolding space The front “X” stabilizers single side working Pumping with huge displacement keep...
...tanks. It heating method including electric heating, steam heating etc. 1. Material: sus 304/copper 2.Inner tank diameter:650mm-2100mm 3.Cylindrical height: 600-4000mm Distillation Pot red copper inner with ...