| Sign In | Join Free | My burrillandco.com |
|
...be sent within 5 working days. Shipping method By DHL, UPS or as per your requested. Payment method Courier fee to be collected by the receiver. Features: Stable quality Easy installation Height adjustable E...
... period Free samples can be sent within 5 working days. Shipping method By DHL, UPS or as per your requested. Payment method Courier fee to be collected by the receiver. Features: Stable quality Easy install...
...height 80/100/120mm Packing Information: No.1 1 pcs 1 polybag, 50pcs/carton No.2 As per your requested. Sample rules: Prepare period Free samples can be sent within 5 working days. Shipping method By DHL, UP...
...height Safe height 10X3 270 118 400 7.25 Effective Diameter Φ200 Connection Method CY Series Compressed height 118mm Maximum Height 400mm Full Stroke 282mm Working medium Water,Air Working pressure ≤0.7Mpa B...
...working days Payment method:30% deposit, full payment before departure Technical parameters 1. Plate effective Max width: 1300mm; 2. Plate effective length:400-2600mm; 3. Glued Plate effective thickness:2—50...
... (width*height*depth ) mm 1004*729*325 Outline dimension including flange(width*height*depth ) mm / Weight Kg 58 Installation method Door Mounted Installation method Outdoor Environment and protection Workin...
...work in the field; Batch Recycling Heating Method; With famous burner brand; Indirect heating exchanger # Item Unit 1 Model / 5GP-8.3 2 Heating Method / Batch Recycling 3 Outer Dimension(L×W×H) mm 5280×2460×...
...:400-2600mm; 3. Glued Plate effective thickness:2—50mm 4. Composite Plate effective thickness:5—70mm 5. Speed:5-20m/min 6. Working height:800mm 7....
...working days Payment method: 30% deposit, full payment before departure Technical parameters 1. Plate effective Max width: 1300mm; 2. Plate effective length:400-2600mm; 3. Glued Plate effective thickness:2—5...
... adjustment) Main material: cold-rolled steel Length offer: 10/12/14/16/18/20/22" Height adjustment: 0-3mm Sample rules: Prepare period Free samples can be sent within 5 working days. Shipping method By DHL,...
... slide Main material: cold-rolled steel Length offer: 10/12/14/16/18/20/22" Height adjustment: 0-3mm Sample rules: Prepare period Free samples can be sent within 5 working days. Shipping method By DHL, UPS o...
... cabinet door/Tatami/Dresser etc Port of departure: Shenzhen, Guangzhou Sample Rules: Prepare period Free samples can be sent within 5 working days. Shipping method By DHL, UPS or as per your...
...Work principle: The test sample is placed on a horizontal wooden plate, drop it from 50mm to the hard wooden plate for 50 times. Technical parameters Model No. KP-GT066 Standard Power Supply AC220V, 50/60HZ ...
...works with DSP controller directly. Data Sheet For NC6090 CNC Router Working Table Size:880mm*1320mm Drive Method:stepper motor Spindle Power:1.5KW water Cooling Spindle Max Feeding Height/Z-axis height:100m...
...Method: Drawer Type PCB Tray: High temperature resistant transparent tray Accessible height: 40±5mm Working area:360×300mm Control Method Control Mode: PID+Computer Communication Mode: RS485 Heat Method Temp...
...RS485 Heat Method Temperature zone: Single zone 16 stage Temp control Number of temperature control stage: 1~16 stage,which can be set according to actual. Temp Control Method:Microcomputer automatic temp co...
...Method: Drawer Type PCB Tray: High temperature resistant transparent tray Accessible height: 40±5mm Working area:360×300mm Control Method Control Mode: PID+Computer Communication Mode: RS485 Heat Method Temp...
...RS485 Heat Method Temperature zone: Single zone 16 stage Temp control Number of temperature control stage: 1~16 stage,which can be set according to actual. Temp Control Method:Microcomputer automatic temp co...
....3 "Test Methods for Dust Physical Properties - Part 3: Determination of Bulk Density - Natural Bulk Method", mainly suitable for the determination of dust bulk density. Working principle: When dust falls fr...