| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | Original Factory |
| Model Number : | EP3C120F780I7N |
| Certification : | Lead free / RoHS Compliant |
| Payment Terms : | T/T, L/C, Western Union |
| Supply Ability : | 80000 Piece/Pieces per Month |
| Delivery Time : | 3-7 work days |
EP3C120F780I7N Ic Integrated Circuit BGA780
Product Description
Product Specifications
| Product Technical Specifications | |
| EU RoHS | Compliant |
| ECCN (US) | 3A991 |
| Part Status | NRND |
| HTS | 8542.39.00.01 |
| Automotive | No |
| PPAP | No |
| Family Name | Cyclone庐 III |
| Process Technology | 65nm |
| User I/Os | 531 |
| Number of I/O Banks | 8 |
| Operating Supply Voltage (V) | 1.2 |
| Logic Elements | 119088 |
| Number of Multipliers | 288 (18x18) |
| Program Memory Type | SRAM |
| Embedded Memory (Kbit) | 3888 |
| Total Number of Block RAM | 432 |
| IP Core | Viterbi Compiler, Low-Speed/Hybrid Serial Decoder|V1 ColdFire|SpeedView Enabled JPEG Encoder (SVE-JPEG-E)|10 Gigabit Ethernet MAC|32/64-bit PCI-X bus Master/Target interface Core, 66/100/133Mhz |
| Provider Name | Altera/Freescale/CAST, Inc/MorethanIP/PLDA |
| Device Logic Units | 119088 |
| Number of Global Clocks | 20 |
| Device Number of DLLs/PLLs | 4 |
| Programmability | No |
| Reprogrammability Support | No |
| Copy Protection | Yes |
| Opr. Frequency (MHz) | 437.5 |
| In-System Programmability | No |
| Speed Grade | 7 |
| Differential I/O Standards | LVPECL|LVDS|HSTL-18|HSTL-15|HSTL-12|SSTL-2|SSTL-18|RSDS |
| Single-Ended I/O Standards | LVTTL|LVCMOS|PCI|PCI-X|SSTL|HSTL |
| External Memory Interface | DDR2 SDRAM|QDRII+SRAM |
| Minimum Operating Supply Voltage (V) | 1.15 |
| Maximum Operating Supply Voltage (V) | 1.25 |
| I/O Voltage (V) | 1.2|1.5|1.8|2.5|3.3 |
| Minimum Operating Temperature (°C) | -40 |
| Maximum Operating Temperature (°C) | 100 |
FAQ
Q1: How long is your delivery time?
A: Group buying delivery time: 30-60 days; General delivery time:
20 days.
Q2: How to buy your products?
A: You can buy the products from our company directly.Normally the
procedure is sign the contract, payment by T/T,Contact the shipping
company to delivery the goods to your country.
Q3: How about your delivery time?
A:Generally, goods would be shipped in 1-7 work days after payment
received, finally depends on order quantities.
Q4: What is your MOQ?
A:Minimum order quantity starts from ONE piece,it depends your
specific order!
Q5: HOW can we get samples from you?
A:Samples are available. Normally we take 2 days to arrange
samples. If we have no business record with you before, we need to
charge boot samples cost and post courier freight.
Q6:What is your products quality?Do you test all your goods before
delivery?
A:Yes,We have 100% test before delivery,We can ensure the product
quality of our company. All products have 30-90 days of quality
assurance.
Any other more questions, please feel free to contact us. We are
always at your service !
1.14V ~ 1.26V |
|