| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | ChenMu |
| Model Number : | CM-SZ23670-A75*145°-80H1 |
| Certification : | CE,RoHS |
| Price : | Negotiable |
| Payment Terms : | T/T, Western Union, MoneyGram |
| Supply Ability : | 100000PCS/Per week |
| Delivery Time : | 3-5 working days |
Asymmetric 75*145Degree 80in1 3030 led PC material for Led Street Moudle Lighting
Quick detail
| Product Name: | CM-SZ23670-A75*140°-80H1 | Beam Angle: | 75*140°Degree |
| Efficiency: | 92% | Material: | PC |
| LED Chips | 3030 | Size: | L236*W70 mm |
| Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module | ||
| Application: | Street Light,Flood Light,Tunnel Light | ||
| Other Light Distribution: | 30°60°/ 90°/60*90°/75*140° ect | ||
Description:
Asymmetric 75*145Degree 80in1 3030 Led PC Material For Led Street Moudle Lighting
Please use a litter water and soft fabric (air-laid paper) to clean the product if necessary.
The working temperature is -35ºC~+120ºC.
Protect the product from the sun and other ultraviolet ray, as these will lead to aging, change color, crack, etc.
Specifications
| Product Name: | CM-SZ23670-A75*140°-80H1 |
| Beam Angle: | 75*140°°Degree |
| Efficiency: | 92% |
| Material: | PC |
| LED Chips | 3030 |
| Size: | L236*W70 mm |
| Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
| Application: | Flood Light,Tunnel Light, Street Light |
| Other Light Distribution: | 30°/60°/ 90°/60*90°/75*140° ect |
| Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
| Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: | EXW , FOB , CNF , CIF |
| Payment Terms: | T/T , PayPal , Western Union, Moneygram |
| Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
| Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, |
IES

Drawing

Application:

Notices:
Storage: Do not store in dusty place, or expose under corrosive
environment.
Contact: Do not touch the lens surface with bare-hand. Please use
gloves to
touch the lenses.
Cleaning: Clean lenses only if necessary. Use only mild soap, water
and
soft cloth.Do not use any commercial cleaning solvents.
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
|
| Company Info. |
| ChenMu Lighting technology co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |