| Sign In | Join Free | My burrillandco.com | 
              
  | 
      
| Ask Lasest Price | |
| Brand Name : | CSAK | 
| Model Number : | SK02-111009APNL | 
| Certification : | RoHs , UL , SGS | 
| Price : | Price to be negotiated in person | 
| Payment Terms : | T/T | 
| Supply Ability : | 1000,000pcs/Month | 
| Delivery Time : | 24-30 work days | 
90 Degree Modular Jack Shielded Single Port RJ45 Connectors Socket Metal Housing
Applications
| 10/100/1000 Base-T | |
| Mounting Type | Through Hole | 
| Orientation | 90° Angle (Right) | 
| Termination | Solder | 
| LED Color | Green - Green | 
| Number of Cores per Jack | 8 | 
| Shielding | Shielded, EMI Finger | 
| Features | Board Guide | 
| Tab Direction | Up and Down | 
| Contact Finish | Gold | 
| Shield Material | Copper Alloy | 
| Housing Material | Polybutylene Terephthalate (PBT) | 
| Connector Type | 6 8 Pin Shield Unshield LED Female RJ45 Connector | 
| Number of Positions/Contacts | 8p8c (RJ45, Ethernet) | 
| Mounting Type | Through Hole | 
| Termination | Solder | 
| Shield | 0.20~0.25mm thickness brass with tin plated | 
| Contact Material | Copper Alloy | 
| Contact Finish Thickness | flash | 
| Housing Material | Thermoplastic | 
specifications:
Q: What is the Minimum Order Quantity(MOQ)?
A: Normally, MOQ is 1000pcs, but special requirements can be
accepted.
Q: How much do I need to pay for your OEM service?
A: No need to pay extra cost for our OEM service if order quantity
over 1000 pcs. The OEM cost includes in the unit price.
Q: What is the lead time?(How long do you need me to prepare my
goods?)
A: 2-4 days for sample orders, 10-15 days for mass production
orders (based on different quantities, OEM , etc.)
Q: How will you deliver goods to me?
A: We ship by air and sea generally. In the mean time, we cooperate
with international expresses such as DHL, UPS, FedEx, TNT to enable
our customers to get their goods rapidly.
Q: How long do I need to wait before my goods arrive?
A: 5-7 days for air transportation, 3-5 days for international
express.
Shipping:
1. We can shipping all over the world by DHL , UPS , FedEx and EMS
. The packaging is very safe and strong. If you have any special
needs please nitfy me.
2. It will take around 3-5 days to reach your hands .
Advantages
1. R & D personnel with over 10year's experience
2. Automated facilities for cost-efficient production
3. Conforming to ISO9001:2008 and RoHs standards
4. Short lead times:5~7working days
5. OEM/ODM orders welcome
6. One-stop service from R&D and mold design to mass production
7. All components and accessories made in-house
8. Own lab with X-ray plating thickness,IR reflow soldering and Schaffner insulation testers
                                 
                             | 
                        
| Company Info. | 
| ZHEJIANG SAK ELECTRONICS CO.,LTD | 
| View Contact Details | 
| Product List |