| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | Hebei Pantu |
| Model Number : | YG21 |
| Certification : | API 16C |
| Price : | USD 50000-100000 per set |
| Payment Terms : | T/T |
| Supply Ability : | 5 sets per 3 months |
| Delivery Time : | 7 work days |
High Pressure 3000psi Choke Kill Manifold For Well Drilling
Four manual gate valves (or five gate valves if a bypass valve is added) make up the choke manifold. Before the flow enters the processing equipment to safeguard the well, this equipment lowers well pressure and regulates flow rate. A hydraulic control panel for remote control may be installed.
Parameter of Choke Kill Manifold
| Type | Working pressure | Main bore dia | By-pass dia. | Remarks |
| (psi) | On.) | (In.) | ||
| YG140 | 20000 | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | 3 1/16" 2 1/16" 2 9/16" | Different types of combinations can be provided according to requirements |
| YG105 | 15000 | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | 3 1/16" 2 9/16" 2 1/16" | |
| YG70 | 10000 | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | |
| YG35 | 5000 | 4 1/16" 3 1/8" 2 9/16" 2 1/16" | 4 1/16" 3 1/8" 2 9/16" 2 1/16" | |
| YG21 | 3000 | 4 1/16" 3 1/8" 2 9/16" 2 1/16" | 4 1/16" 3 1/8" 2 9/16" 2 1/16" |
Working Principle of Choke Kill Manifold
When the pressure inside the well rises, opening/closing the choke
valves(including manual chokes, hydraulic chokes, and positive
chokes)on the choke manifold can allow the release of the fluid
inside the well to control casing pressure, which can be directly
blown out through the gate valve if the casing pressure is quite
high.
4. Pressure Ratings
The kill manifold is available in pressure ratings of
2000psi,3000psi,5000psi,10000psi, and 15000psi, and also can be
available upon customer request.
Operating Instructions
(1) The working pressure of all components on the choke manifold
shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the
operator can reach it easily. The pressure test must be performed
before installation and the seat test pressure shall be equal to
the rated working pressure.
(3) The line pipe shall be level and straight as much as it could.
In case of the turn of the line pipe, the 120-degree steel bent
pipe shall be used. The bore of the line pipe shall be large
enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under low-temperature
conditions.
|
| Company Info. |
| Hebei E-valves Petroleum Equipment Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |