Sign In | Join Free | My burrillandco.com
Home > Cranes >

Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

    Buy cheap Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty from wholesalers
     
    Buy cheap Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty from wholesalers
    • Buy cheap Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty from wholesalers

    Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

    Ask Lasest Price
    Brand Name : Dowellcrane
    Model Number : JQJ Beam Launcher Girder Crane
    Certification : ISO CE BV CCC GOST SGS
    Price :
    Payment Terms : L/C, T/T
    Supply Ability : 2000 Sets per Year
    Delivery Time : 60days
    • Product Details
    • Company Profile

    Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

    400 Ton Bridge Girder Erection Crane For Highway And Railway Construction


    Product Description


    In addition to the standard bridge operation, the 400 Ton Bridge Girder Erection Crane can also meet the requirements of first and last span
    erection, curve erection, variable span erection, span continuous beam, combination beam, continuous steel structure, etc. Existing bridge erection, simple support span continuous erection and other working conditions.It has the advantages of simple erection, fixed point hoisting, good lifting stability, high operating efficiency, safety and reliability, easy to adjust span and easy to operate.


    Product Characteristics

    • The arm can move up and down, move back and forth, swing the head to the left and right, can set up an inclined bridge (0-45 °), a slope bridge 5% (in Yunnan, Malaysia, Greece, the Zui slope is up to 8%), small curve convenient and quick;
    • The whole machine adopts step-by-step advancement, and the guide arm passes through the hole;
    • It adopts gear and rack drive, which has good self-locking performance.
    • Relying on driving to drive the outriggers forward, no need to configure the outriggers vertical movement force;
    • Use the electric machine to move horizontally to realize the full-scale mechanized falling beam;
    • Adopt the hydraulic cylinder to push and add the whole machine to move the way, once the falling edge beam is in place;
    • The outriggers use the driving power to achieve longitudinal movement and reduce the power of the whole machine;
    • The electrical system is controlled by a programmable controller, with good interlocking performance, preventing two directions from acting simultaneously, effectively controlling misoperations, and ensuring safety and reliability.

    Maintenance

    • Routine maintenance: (performed by the on-duty driver before, after and during operation)

    1. Clean the dust and oil on the driver's cab and airframe regularly to keep the inside and outside of the machine as clean as possible;
    2. Check whether the brake clearance is appropriate;
    3. Check whether the keys and coupling bolts on the coupling are tight;
    4. Check whether each safety device is sensitive and reliable;
    5. check the wear of brake belts and wire ropes;
    6. Check if the contacts of the controller are close and consistent;

    • Second level maintenance (per month by the driver)

    1. Fill the rolling bearings with grease;
    2. Check the insulation of all electrical equipment;
    3. Whether the control screen, protection panel, controller, resistor, each terminal block and terminal nut are tight;
    4. Check the oil quantity of the reducer, the oil quantity of the brake hydraulic solenoid and the lubrication condition. When the amount of oil is insufficient, lubricating oil and grease should be added.

    • Third and second level maintenance (once quarterly or semi-annually. Under the guidance of technical staff, performed by the driver)

    1. Lubricate the rolling bearing;
    2. check the insulation of all electrical equipment;
    3. Whether the control panel, protection panel, controller, resistor, each terminal block, and the connection nut are tight.
    The above is the maintenance method of the bridge crane. For large machines such as bridge cranes, we must remember to carry out maintenance work regularly in a certain way, and we must not neglect to prevent engineering delays and losses due to insufficient daily maintenance.


    Parts Of Crane



    Quality Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Henan Dowell Crane Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Launcher Crane products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0