Sign In | Join Free | My burrillandco.com
Home > Waterproof Membrane >

Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

    Buy cheap Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes from wholesalers
     
    Buy cheap Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes from wholesalers
    • Buy cheap Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes from wholesalers

    Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

    Ask Lasest Price
    Brand Name : Wage
    Model Number : HG TP
    Certification : EMS, OHSMS
    Price : FOB 1800- 1900 USD per ton
    Payment Terms : L/C, T/T, Western Union, MoneyGram
    Supply Ability : 20 tons per week
    Delivery Time : 1- 3 weeks
    • Product Details
    • Company Profile

    Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

    Asphalt Road Patching Material For Pothole repair


    Thermoplastic asphalt road repare patching material


    General Description

    This material is an elastic repair material, composed of modified asphalt, chalk powder, polymer materials, quartz sand, rubber powder, and other materials mixed with special additives.

    Special for hot-applied, aggregate-flled, polymer-modifed asphalt pavement repair mastic, used for repairing distresses in asphalt .


    Product Specifications

    ItemRange
    ApperaranceGranules
    ColorBlack
    Operation Melt temperature280°C
    Curing Time5-8 minutes

    Application:

    * Filling wide cracks and joints

    * Filling potholes

    * Road reticular crack repairing

    * Pretreatment of fatigue cracked are prior to surface maintenance

    * Repairing and Leveling manhole covers

    * Leveling bridge deck approaches

    * Repairing deteriorated longitudinal joints such as tramcar

    * Filling spalls, popouts,and breaks, etc

    Packaging

    White PE bag,N.W.10kg/bag.

    1000kg/pallet. 1.2*1.0*1.0M size for pallet


    Storage

    The product can be stably stored for at least one year when kept in a dry place at temperature below 30°C.Avoid exposure to direct sunlight.


    Using step

    1.Clean the moisture and dust in the area to ensure they are dry and clean

    2.Use a thermoplastic boiler to heat the elastic asphalt patching material to 280 ℃

    3.Choose different widths of coating scoop based on the size of crack or other damage


    Caution

    When the material is melt will keep a high tempreture on itself and machine or tools, pls mind the scald


    Contact

    Rita QU

    Xi'an Wage Traffic Infrastructure Installation Co.,LTD
    Mail: wagetraffic@hotmail.com Cell/ Whatsapp: +86 15591818803
    Add:Room 401, Unit 2, Bilding 2, Shenglong Plaza, Weiyang Road, Xi'an, 710016, Shaanxi, China
    Quality Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Xian WAGE Traffic Infrastructure Installation Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Asphalt Patch Material products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0