Sign In | Join Free | My burrillandco.com
Home > Workshops & Plants >

Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution

    Buy cheap Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution from wholesalers
     
    Buy cheap Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution from wholesalers
    • Buy cheap Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution from wholesalers
    • Buy cheap Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution from wholesalers
    • Buy cheap Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution from wholesalers

    Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution

    Ask Lasest Price
    Brand Name : KAFA
    Model Number : KAFA-2023035
    Certification : ISO 9001:2015; ISO14001:2015; ISO45001:2018
    Price : USD40~60 per square meter
    Payment Terms : T/T, L/C
    Supply Ability : 15,000 square meter per month
    Delivery Time : 6 weeks after shop drawing approval
    • Product Details
    • Company Profile

    Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution




    Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution

    Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution uses steel to form a load-bearing structure. Generally, the load-bearing structure called main frame, which are consist of beam, column and truss. The bracing system are including tie bar, knee bracing, staying bar, column bracing, as well as horizontal bracing. Together with roof system, wall system, and floor system, they are conforming an entire metal structure building.


    Compared with traditional concrete buildings, metal workshop buildings apply steel plates or sectional steel instead of reinforced concrete, thus the workshop steel structure performs much higher strength, and better seismic resistance. Because of the components mostly being prefabricated in factories and assembled on-site, the construction period is greatly reduced. Due to the re-usability of steel, it can greatly reduce construction waste and become more environmentally friendly.






    Specification of the
    Industry Prefabricated Metal Structurral Designed Building Workshop


    DimensionLength x Width x Eave height/ Ridge height
    Frame typePortal frame, multi-story frame
    Main frameHot-rolled or Welded H beam and column, Q355B steel
    Bracing componentsTie bar, staying bar, Horizontal bracing, Column bracing
    Cladding systemCorrugated color steel sheet, sandwich panel with glass wool, rock wool,PU insulation
    AccessoryRidge tile, trim, Gutter, Down pipe,skylight, clerestory
    DoorSliding door, Roll up door, industrial section door, swing door
    WindowPVC window, aluminum window, metal louver

    Advantages of Metal Structure Workshop


    1. Easy to assemble

    The steel components arriving at the construction site are all prefabricated. During the construction process, the installation work needs to layout each structure and erect it according to the installation drawing.

    The installation sequence of the steel workshop building is:

    First, install the steel columns and column cross-bracing and install roof beams and roof horizontal bracing. Finally, installs the purlin and enclosure structure.


    2. Reasonable cost:
    The steel structure workshop building is light in weight, reducing the basic cost, and the construction speed is fast. It can be completed and put into production as soon as possible. The overall economic benefits are much better than that of the concrete structure


    3. Simple construction, short construction period.
    The production and installation of steel structure usually involve processing all required components in the factory and then transporting to the construction site to assemble. So the construction period is greatly shortened. A 4000 square meter building can be basically installed in only 40 days.


    4. Energy-saving and environmentally friendly
    The corrugated color steel sheet and sandwich panels used in the prefab steel structure workshop are all energy-saving materials. The steel structure also adopts dry construction during the construction process to avoid dust and environmental pollution caused by concrete construction.


    Design Important Factors


    1. Reasonable column spacing

    Steel structure buildings mainly apply H-section steel columns and steel beams. The spacing of H-section steel columns has a significant influence on the total quantity of steel used and the total cost. We usually apply economic column distance of 6.8m to 9m, based on the normal load of the structures.
    As for the projects with special needs, that can be flexibly adjusted. The determination of building height should not only meet the requirements of production equipment and production operations but also consider the height of maintenance more comprehensively.


    2. Proper lighting and ventilation design

    As the enterprises adopt intensive production, the characteristics of large-span and large-space internal spaces are becoming more and more apparent. Therefore, steel building design should pay attention to lighting and ventilation design from the perspective of humanization and energy saving. When the workshop building is tall, the openable window at the bottom of the side exterior wall is used as the primary air inlet. By installing a roof ventilator, the ventilation and lighting problems are easily solved, and the actual operation is relatively simple.


    Difference between metal structure building and concrete building


    1.Short construction period

    In terms of the construction cycle, the steel structure has obvious advantages. The construction of the steel structure building is very fast because it is prefabricated in the factory and assembled on the construction site. Only slight weld works need be applied on site.


    2. Environmental Friendly

    After transported to the construction site, the steel components only need to be hoisted and spliced. The whole process can be operated without water. There is no flying sand and a large amount of dust, which can reduce environmental pollution and impact on nearby residents.


    3. Favorable Cost

    Steel structure buildings save construction period and labor costs compared with concrete buildings. The total cost of a steel structure building roughly is 20%~30% lower than that of traditional concrete building. What’s more, steel structure is more robust and more durable than concrete.


    4. Structure Weight

    The steel structure itself has the characteristics of lightweight. The walls and roofs of the steel structure are made of light metal building materials, which are much lighter than the brick-concrete wall and roof.


    Nearly 20 years of operating experience, KAFA has built our reputation by successfully implementing hundreds of projects in domestic and overseas. With a team of professionally trained engineers, KAFA always has complete solutions suitable for your project with a variety of choices from simple to complex including:

    Pre-Engineered Steel Buildings
    Buildings For Heavy Industry
    Buildings for commodity industry
    Industrial Steel Structures

    Your satisfaction is our key success factor.
    Contact us for the best solutions for your project!




    Quality Long Life Span Rigid Frame Prefabricated Steel Structure Workshop Building Solution for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Qingdao KaFa Fabrication Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Steel Structure Workshop products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0