Sign In | Join Free | My burrillandco.com
Home > Work Platforms >

1000kg Aerial Lifting Platform

    Buy cheap 1000kg Aerial Lifting Platform from wholesalers
     
    Buy cheap 1000kg Aerial Lifting Platform from wholesalers
    • Buy cheap 1000kg Aerial Lifting Platform from wholesalers

    1000kg Aerial Lifting Platform

    Ask Lasest Price
    Brand Name : KENI
    Model Number : SJY03-4
    Certification : CE ISO
    Price : Negotiable
    Payment Terms : L/C, T/T
    Supply Ability : 1000PCS
    Delivery Time : 10work days
    • Product Details
    • Company Profile

    1000kg Aerial Lifting Platform

    1000kg Trail-type small platform folding scissor lift with extension platform


    1. The lifting platform has been inspected and debugged at the factory before delivery. All the technical indexes have reached the design requirements. When using, the lifting platform only needs to be connected with the power supply, and the hydraulic system and electrical system need not to be adjusted.

    2. The platform should be carefully checked before use of hydraulic, electrical systems, no leakage or naked leakage before use.

    3. Lifting platform in use, the four legs should be firmly supported on a solid ground (with the wheel to leave the ground shall prevail) if necessary, the use of sleepers.

    4. Lifting platform empty run 1-3 times before loading operation.

    5. load center of gravity should be as far as possible in the center of the table.

    6. Guard railings at both ends of the movable door should be locked after the lock operation.

    1, Maintenance introduction
    a. Wheels, countershafts and bearings, cylinder pin and bearing, jib hinge shaft and bearing wear.
    b. All parts are filled with some lubricants to extend the service life of bearings.
    c. Hydraulic oil and oil level. Lifting platform throughout the rise, in this position, the hydraulic floor should be higher than the bottom 40 to 50 mm. If it is found that the hydraulic oil is dark, sticky or gravel and other foreign objects should be promptly replaced (winter replacement 32 # hydraulic oil, summer 46 # hydraulic oil. In particularly cold northeast, should be replaced transformer hydraulic oil).

    2, Mid-year inspection
    a, According to the order of six months or 500 hours prioritized.
    b, The whole platform will rise and fall, into a brace.

    Quality 1000kg Aerial Lifting Platform for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: HENAN KONE CRANES CO.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Aerial Lifting Platform products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0