| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | HDB |
| Certification : | ASME, SGS, ISO9001 |
| Delivery Time : | 30~50 days |
ASME Standard Carbon Steel Seamless Steel Superheater for CFB Boiler
Superheater Arrangement, specification and material:
Arrnagement and specification:
The boiler has high and low superheaters, the HS is arranged in the
flue gas duct after cyclone separators, and the LS is arranged in
back-end vertical shaft. The saturated steam is introduced into the
ceiling enclosure headers by eight φ108×5 saturated steam
connecting tubes on the drum, and then into the lower temperature
superheater through φ 42×4.0 tubes, after being heated by LS, goes
into desuperheater for adjusting temperature, and then goes into HS
through eight tubes of φ108×5, and sent to steam turbine through
main steam valve after going into SH outlet header.
The LT superheater adopts contranatant arrangement and the HT
superheater is downstream arrangement. The collection and
distribution of steam adopts the way of width direction to improve
non-uniformity of steam flowing and prevent local coils superheated
due to steam deflection.

Material:
To ensure safety operation, the LT superheater uses SA210 Gr.A1
seamless steel tubes, and the HT superheater uses low-alloyed SA213
T22 seamless steel tubes.
Thechnical parameters:
| Material | carbon steel, alloy steel , or durable heat steel |
| Tube OD | 10-114mm |
| Tube W.T. | 0.8mm- 15mm |
| Structure | vertical or horizontal |
|
| Company Info. |
| Zhangjiagang HuaDong Boiler Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |