| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | OEM |
| Model Number : | G353A049 |
| Certification : | ce |
| Price : | price negotiable |
| Payment Terms : | T/T in advance,Western Union,Paypal,Credit card |
| Supply Ability : | 2000 pcs |
| Delivery Time : | within 1-30 working days after payment |
CONSTRUCTION
Body Aluminium
Springs Stainless steel
Diaphragms CR (chloroprene)

FEATURES
• The pulse valves are especially designed for dust collector
service applications, combining high flow, long life and extremely
fast opening and
closing to produce reliable and economical operation
• The high flow, angle type bodies in combination with the special
main diaphragm assemblies give the unique operating features
required for dust
collector service applications
• Integral compression fittings for fast, easy, secure installation
• Valves can be supplied according to ATEX Directive 94/9/EC for
non-electrical equipment by using suffix GD
• The components satisfy all relevant EC directives
SPECIFICATIONS
| pipe size | orifice size | flow coefficient Kv | operating pressure differential (bar) | catalogue number | OPTION FPM | |||
| mln. | max. (PS) | |||||||
| air | ||||||||
| (mm) | (m3/h) | (l/min) | -/= | standard | ATEX II2G/D | |||
| G - Threaded pipe connection | ||||||||
| 1 1/2 | 52 | 46 | 768 | 0,35 | 8,5 | G353A046 | G353A046 GD | V |
| 2 | 66 | 77 | 1290 | 0,35 | 8,5 | G353A048 | G353A048 GD | V |
| 2 1/2 | 66 | 92 | 1540 | 0,35 | 8,5 | G353A049 | G353A049 GD | V |
| 3 | 76 | 170 | 2833 | 1,0 | 6,0 | G353-058 | G353-058 GD⑴ | V |

| catalogue number | A | B | C | D | E | F | G | H | weight | |
| G353A046 (GD) | 30 | G | 1/8" | 71 | 130 | 136 | G3/8" | 90 | 120 | 1,10 |
| G353A048 (GD) | 30 | G | 1/4" | 95 | 168 | 165 | G3/4" | 121 | 166 | 2,60 |
| G353A049 (GD) | 30 | G | 1/4" | 95 | 168 | 165 | G3/4" | 121 | 166 | 2,30 |
| G353-058 (GD) | 48 | G | 1/4" | 143 | 240 | 192 | G1/2" | 121 | 214 | 3,70 |
| G353A063 (GD) | 30 | G | 1/8" | 87 | 177 | 136 | G3/8" | 96 | 183 | 1,43 |
OPTIONS
● Valves can also be supplied with FPM (fluorelastomer) diaphragms
and seal materials. Use the appropriate optional
suffix letter for identification
● Sequential controller for pilot solenoid valves
● Pilot boxes containing 2 to 12 pilot solenoid valves
● Pilot solenoid valves can be equipped with explosionproof
solenoids for hazardous locations according to “ATEX” and
national standards
INSTAllATION
● The valves can be mounted in any position without affecting
operation
● Threaded pipe connection is: G = G (ISO 228/1) or compression
fittings
● When connecting piping or tubing to the G1/8 or G1/4 connection
in the valve bonnet, the remote pilot valve should be
mounted as close as possible to the main pulse valve. Connection
tubing lengths of 3 meter or less have little effect on the
pulse response. Installations with over 3 meter of tubing must be
tested under actual operating conditions. Tubing with Ø 6 or
Ø 8 mm O.D. is recommended for all installations
● For compression fitting types tightness is achieved by the co
mpressed gasket on the blow tube
● Other pipe threads are available on request
● Installation/maintenance instructions are included with each
valve
● Spare parts kit and replacement coils are available


The installment introduction:
1. First, Confirm the pulse valve in good condition and then
installed
2. Pulse valve will be installed directly the outer wall of flange
of gas manifold. The spray pipe across the gas manifold. According
to the drawing and manual, the pulse valve matching appropriate
spray pipe and installation. To avoid the valve install in the air
manifold bottom. If the pulse valve matched trachea and connector,
the connector will be used for sealing purpose only. It can not as
structural support components. It can not rely on the straight
connector fixed spray torch and package. The spray pipe and air
manifold must be fixed independent.
3. To tighten the hard nut, the maximum torque of 20 N*m.Tighten
the trachea, torsion of 20 N*m.
4. The connection control wire needs connect of every electric
control valve seat. Pay attention to the line adown to prevent rain
waterproof. Or through the joint and nylon pipe, it will connect
the pulse valve and electromagnetic assembly boxes of nylon pipe
connection.
5. To ensure that provide compressed air clean and dry. The air
manifold system provides moderate pressure and check for leaks
installation. ( it can brush on soap and water, check whether the
interface is bubble). Pressure was carried out on the air bag
inflated (pressure of the valve is around 0.03 ~ 0. 86 mpa),
recommend for air pressure 0.8 mpa maximum
6. Testing the pulse valve blowing, listening all the pilot valve
whether it is normal operation and whether the pulse blowing sound
is clear.
Delivery
1. If the products we have in store, we will send it out ASAP after
payment.
2. If the products which were customized, we will complete the
production within a specified period of time, and send it out the
first time, we can promise it.
3. Also we can send by your delivery acount if you want.
4. We have a variety of ways to send goods, usually DHL, Fedex, TNT
will be normal ways. If you require use of a courier, we can do it.
Serves time
0:00 - 23:59
From Monday to Sunday
|
| Company Info. |
| Airwolf Automation |
| Verified Supplier |
| View Contact Details |
| Product List |