Sign In | Join Free | My burrillandco.com
Home > Cement Making Machinery >

12000 TPD Max 5 R / Min Cement Plant Equipments cement rotary kiln

    Buy cheap 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln from wholesalers
     
    Buy cheap 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln from wholesalers
    • Buy cheap 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln from wholesalers
    • Buy cheap 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln from wholesalers
    • Buy cheap 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln from wholesalers
    • Buy cheap 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln from wholesalers

    12000 TPD Max 5 R / Min Cement Plant Equipments cement rotary kiln

    Ask Lasest Price
    Certification : ISO/CE
    Brand Name : CITIC LK
    Supply Ability : 150 Set/Sets per Year
    Price : negotiable
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
    • Product Details
    • Company Profile

    12000 TPD Max 5 R / Min Cement Plant Equipments cement rotary kiln

    Products Description

    1,000,000Tons/Year Cement Grinding Plant:

    1,000,000Tons/Year Cement Grinding Plant:
    In this 1,000,000t/y cement grinding plant, clinker and slag are ground separately. PFG120-50 rolling machine and Φ3.2m×13m cement mill are used in clinker ginding. Φ3.2m×13m ginding machine and high-efficiency powder separator are used in slag grinding.
    This plant features are high quality, high productivity and low consumption.
    Cement Rotary Kiln Specification Wet and Dry Cement Rotary Kiln
    Product specifications(m)Kiln dimensionsCapacity(t/d)Rotation speed(r/min)Motor power(kw)Total weight(t)
    Diameter(m)Length(m)Obliquity(%)
    Φ2.5×402.5403.51800.44-2.4455149.61
    Φ2.5×502.55032000.62-1.8655187.37
    Φ2.5×542.5543.52040.48-1.4555196.29
    Φ2.7×422.7423.53200.10-1.5255198.5
    Φ2.8×442.8443.54000.437-2.1855201.58
    Φ3.0×453453.55000.5-2.4775210.94
    Φ3.0×483483.57000.6-3.48100237
    Φ3.0×603603.58000.3-2100310
    Φ3.2×503.250410000.6-3125278
    Φ3.3×523.3523.513000.266-2.66125283
    Φ3.5×543.5543.515000.55-3.4220363
    Φ3.6×703.6703.518000.25-1.25125419
    Φ4.0×56456423000.41-4.07315456
    Φ4.0×604603.525000.396-3.96315510
    Φ4.2×604.260427500.4-3.98375633
    Φ4.3×604.3603.532000.396-3.96375583
    Φ4.5×664.5663.540000.41-4.1560710.4
    Φ4.7×744.774445000.35-4630849
    Φ4.8×744.874450000.396-3.96630899
    Φ5.0×74574460000.35-4710944
    Φ5.6×875.68748000Max4.238001265
    Φ6.0×95695410000Max5950×21659
    Process Flow Design of 1,000,000Tons/Year Cement Grinding Plant:
    1. Designing of Clinker Grinding Production Line
    After gypsum, clinker and limestone are measured by the belt weigher, they will be mixed together in accordance with particular
    proportions, and then sent to the stable weighing warehouse. During this process, magnetic metals are removed by the iron remover
    from these materials. Then mixed materials will be sent into the rolling machine to be crushed. After crushed, they will be sent
    to the powder separator, in which coarse powder will be sent back to the griding mill while the fine one will be sent to the
    elevator for finished products. Finally, they will be sent to finished product storage. Meanwhile, dusty gas from the grinding
    mill will be purified by the environmental protection equipment before discharged into the atmosphere.

    2. Design of Slag Grinding Production Line
    Gypsum, dry slag and pulverized coal are measured by the belt weigher before mixed together according to particular proportions.
    Mixed materials will be sent to the mill for grinding, and during this process, iron remover is employed to remove magnetic metals
    in these materials. After grinded, fine powder will be sent to high-efficeint powder separator, while coarse powder will be sent
    back to the grinding mill. Finished cement will be collected by the air tank pulse bag filter, while the fine powder will be sent
    to the storage for finished products through an elevator. Dusty gases from the mill will be used as the first gas to enter into
    the powder concentrator, which is followed by fresh air. Finally, dusty gas will be purified by the air tank pulse bag filter
    before discharged into the atmosphere.

    3. Design of Mixing Fine Slag and Powder Clinker
    Besides the fineness of powder clinker and fine slag in the grinding production line, accurate measuring and even mixing also need
    to be paid much attention to. That's why we choose to use the screw measurer as the measuring device and the air slide as mixing
    device as well as conveying device.
    FAQ
    Q: Why we believe in luoyang zhongtai industries co., ltd: A: 1. More than 30 years experience. 2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts. 3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates. Q:Delivery time A: parts lead time 1-2months, machines 2-3months. Q:Payment terms A: Accept payment type: T/T, L/C, Western union,Cash. 30% deposit when signed contract. Full payment paid before shipping Q: Quality warranty? A: guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply. Q: After sales service? A: we can supply technical guide for machines running test and parts maintenance if end user needs.
    Quality 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Luoyang Zhongtai Industries CO.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Cement Plant Equipments products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0