| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | DSSD |
| Model Number : | speed governor |
| Certification : | CE |
| Price : | Negotiation |
| Supply Ability : | 10SET/Month |
| Delivery Time : | 3 months |
Generator Price Of Water Turbine/ Hydro Power Plant Control Speed Governor
Introduction
The function of the turbine governor is to control the opening of the water guide blade (paddle blade) by controlling the operation oil amount of the water guide blade paddle (paddle blade servomotor) relay, and then to control the size of the turbine overwater flow to adjust the turbine Speed, which is the role of adjusting the speed of the turbine.
Application

Send enquiry to suppiler
|
| Company Info. |
| Deyang Dongsen Hydropower Equipment Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |