Sign In | Join Free | My burrillandco.com
Home > Boilers >

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

    Buy cheap Compact Structure CFB Boiler Header With Large Diameter Welded Pipe from wholesalers
     
    Buy cheap Compact Structure CFB Boiler Header With Large Diameter Welded Pipe from wholesalers
    • Buy cheap Compact Structure CFB Boiler Header With Large Diameter Welded Pipe from wholesalers

    Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

    Ask Lasest Price
    Brand Name : ORL Power
    Model Number : Customization
    Certification : ISO9001/SGS/TUV/ASME/EN
    Price : Contact me | Get Latest Price
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
    Supply Ability : 500Ton/Tons per Month
    Delivery Time : 50~100 Days
    • Product Details
    • Company Profile

    Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

    Compact Structure CFB Boiler Header With Large Diameter Welded Pipe


    CFB Boiler Header Description


    CFB Boiler Header, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

    The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.


    CFB Boiler Header Performance advantage


    The key to the manufacture of the header is the welding of the end cap (or head). When welding, most manufacturers use manual arc welding, because the weld is single-sided welding, the root quality is difficult to guarantee, and because of the huge of welding work, number of repairing times, the production cycle is long which cause the entire production process slow. Our company adopt the advanced production technology, well-equipped instrument and sophisticated technology, and invented a submerged arc welding method during the header and cover welding. The character is: In the submerged arc welding machine head threading mechanism fixed connection welding wire guide, along the wire guide head to set the wire guide hole, the wire lead head has a certain degree of curvature, welding the inner wall, the wire guide head extension Into the inside of the welding. The welding method mainly solves the problem that the existing welding method of the boiler header and the end cap (or the head) has the advantages of low processing efficiency, waste of argon at the time of processing, need to open the groove, have many processes, high processing cost and unsatisfactory welding fabrication.


    FAQ

    1. Why choose us?

    We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

    We ensure the deliver time, high quality, and the best after-sale service for you.

    2. How to order?
    Welcome come to our factory for inspecting and discussion the technical details.

    Product Tags:

    boiler steam header

      

    low loss header

      
    Quality Compact Structure CFB Boiler Header With Large Diameter Welded Pipe for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Suzhou orl power engineering co ., ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more CFB Boiler Header products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0