Sign In | Join Free | My burrillandco.com
Home > Apparel & Textile Machinery Parts >

H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements

    Buy cheap H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements from wholesalers
     
    Buy cheap H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements from wholesalers
    • Buy cheap H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements from wholesalers
    • Buy cheap H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements from wholesalers

    H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements

    Ask Lasest Price
    Brand Name : Dehai Boiler
    Model Number : Economizer
    Certification : ISO9001 , SGS , ABS , ASME
    Price : Negotiable
    Payment Terms : L/C, T/T
    Supply Ability : 800 Tons / Month
    Delivery Time : 45 Days
    • Product Details
    • Company Profile

    H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements

    SA213T22 Alloy Steel H fin tubes boiler parts economiser for hot water boiler China manufacturer


    H fin tubes Economizer Inspection


    1. The major problem at the economizer section is low temperature corrosion and problems from gas side deposits.
    2. Sliding and leaky expansion joints at the casing may allow accumulation of soot with severe acid attack.
    3. Inspection of tubes bends by opening the inspection covers needs to be carried out to check these.
    4. Uptake area may show cracked expansion bellows sign of acid corrosion.
    5. General cleanliness of these areas indicates the combustion performance in boiler.


    Boiler Economizer Introduction


    1. To obtain an acceptable degree of efficiency and reduce fuel consumption as much as possible by introducing further heat recovery surface so that the gas temperature at the funnel may be as low as practicable, the gas temperature leaving a boiler cannot be reduced much below 30oC above the saturation temperature.

    2. In radiant types a much higher exit gas temperature is usually found. To carry out this further heat exchange, surfaces such as economizers and air heaters are commonly used.

    3. In many radiant boiler types, economizers are also found arranged integrally within the boiler unit. In this location they consist of a number of multi-loop elements of plain tubes connected at their ends to inlet and outlet headers.

    4. Since are situated in a hot gas temperature zone and are required to perform a considerable heat exchange duty, a portion of the water pumped through them may be converted into steam. These steaming economizers are arranged so that water enters the lower header and the steam and water mixture leaves from the top header to the steam drum where the steam and water separate.


    Economizer Application


    Economizers are used externally to boilers for further heat recovery. Economizers are found in the cooler gas zone and are fed with water temperatures around 116oC or 185oC depending upon whether the feed cycle includes high pressure feed heaters after the de-aerator.


    The function of Boiler Economiser


    1. The Economizer in Boiler works on the principle of Heat Transfer. Heat transfer usually takes place from high temperature to low temperature.

    In the case of Boilers, flue gases or exhaust from the boiler outlet are at high temperature and water that needs to be preheated is at low temperature.

    2. So, this temperature difference between water and flue gases helps to increase the feed water temperature.

    3. Depending on the type of operations, design of Economisers can be smoke tube type or water tube type.

    4. In smoke tube type flue gases are inside the tubes and water is on the shell side while in the water tube type, water is in the tube and flue gases are on the shell side.


    Specification
    DescriptionBoiler economizer
    MaterialAlloy steel, Carbon steel, SA210C ,SA213T22, etc
    Material standardASTM, EN or ISO etc.
    DimensionCustomization
    WeightMin: 10 ton

    Max.:1000 ton
    Smelting Process:EF+LF + VD
    ProcessMaterial→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection
    UT standardASTM A388 or EN10228, etc

    After Painting


    Quality H Fin Tubes Economiser Coil Parts SA213T22 Alloy Steel Multi Loop Elements for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang Dehai Boiler Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Economiser Coil products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0