Sign In | Join Free | My burrillandco.com
Home > Mining Machinery >

18HP Water Well Drilling Rig Machine 22KW For Deep Borehole Engineering GK 200

    Buy cheap 18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200 from wholesalers
     
    Buy cheap 18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200 from wholesalers
    • Buy cheap 18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200 from wholesalers
    • Buy cheap 18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200 from wholesalers

    18HP Water Well Drilling Rig Machine 22KW For Deep Borehole Engineering GK 200

    Ask Lasest Price
    Brand Name : ShiTan
    Model Number : GK 200
    Certification : ISO
    Price : Customzied Quotation list
    Payment Terms : T/T, Western Union
    Supply Ability : 2000SETS/YEAR
    Delivery Time : 7 DAYS AFTER PREPAID
    • Product Details
    • Company Profile

    18HP Water Well Drilling Rig Machine 22KW For Deep Borehole Engineering GK 200

    18 HP GK 200 Portable Water Well Drilling Rig Machine For Deep Borehole Engineering


    Product Description


    200m Water Well Drilling Rig 6-9M/ Hour Easy Operation Standard Water well drilling rig is also called bore hole drilling rig Gk-200-2 drilling machine is widely used and hydraulic feeding , which has the characteristics of large power, large lifting force (2T) and high transmission torque.


    Product Technical Parameter


    Drilling depth200m
    Max open hole caliber300mm
    End hole caliber75mm
    Drill rod caliber60mm
    Drilling angle90°~75°
    Drill weight (without power)975kg
    Triangle convert beltB950 x 4 B1700 x 3
    The main machine moving distance300mm
    PowerDiesel engine 22KW /Electric motor 15kw
    Spindle
    spindle speed64, 128, 287, 557r/min
    Spindle stroke450mm
    Hoist
    Max.lifting capacity2400kg
    Single line lifting speed0.41, 0.82, 1.64m/s
    Wire rope caliber13mm
    Wire rope length35m
    Reel diameter140mm
    Hug floodgate caliber260mm
    Hug floodgate belt width70mm
    Mud pump
    TypeHorizontal single-urn twin-action
    DisplacementDiesel engine 170L/min Electric motor 150L/min
    Maximum pressure3Mpa
    Work pressure1.5Mpa
    Inlet pipe caliber40mm
    Outlet pipe caliber30mm
    Triangle convert beltB1728mm
    Hydraulic oil pump
    TypeCBT-F-314
    Triangle convert beltB1100 X 1

    Product Advantages


    Adopt automatic hydraulic feeding equipment,improve the drilling efficient;Can replace the drilling rod without stop;Centralized handles, easy operation, safe and reliable.;The drilling rig, pump and diesel engine are installed on a common base frame to make sure the compact structure and save space;The weight is light with high detachability ,easy transportation suit for the operate in plains and mountain areas


    What aspects should we pay attention to in the drilling process of water well drilling rig?


    Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

    1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

    2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

    3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.


    Quality 18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200 for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Jinzhou City Shitan Machinery Equipment CO. LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Water Well Drilling Rig Machine products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0