| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | HDPARTS |
| Model Number : | N04CT |
| Price : | Looking forward to your inquiry |
| Payment Terms : | T/T, Western Union, MoneyGram,HSBC |
| Supply Ability : | 1000 Piece/Pieces per Month |
| Delivery Time : | 2-5 work days |
N04CT Silvery Diesel Engine Pump 16100-E0780
Specification
| Applicable models | N04CT |
| Type | Water Pump |
| Original number | 16100-E0780 |
| Warranty | 6 months |
| Engine Type | Diesel |
| Brand Name | HDPARTS |
| Condition | New |
| Size | OEM Size |
| Vibration cause analysis | Hydraulic and other aspects |
| Noise causes | (1) The impact of the rotary vane on the cylinder block, the sound of the residual volume of the water pump and the pressure oil in the exhaust dead space; (2) Impact of exhaust valve plate on valve seat and supporting parts; (3) Echo and bubble cracking sound in the box; (4) Bearing noise; (5) Noise caused by a large amount of gas and oil impacting the oil baffle; (6) Others. Such as the noise caused by the drive, the fan noise of the air cooling water pump, etc. (7) Motor noise is a crucial factor. |
Product Description


Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery
parts market in 1995. It is located in the center of the world's
largest industrial distribution center.
is supported by scientific research and development strength, new
business philosophy, mature marketing team, development and sales
of high quality excavator parts.
covers a wide range, and its products are characterized by high
strength, high toughness, high temperature resistance, no
deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage
parts, General consumable parts, Engine spare parts, and stuff like
that which are high-qualified products.
The product matching different kinds of excavator spare parts,
which caters to the current market demand for high.

Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
|
| Company Info. |
| Guangzhou Star Mustang Construction Machinery Parts Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |