| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | No brand |
| Model Number : | EPE 20-G |
| Certification : | SGS |
| Price : | Negotiable |
| Payment Terms : | T/T |
| Supply Ability : | 1 million sqm per week |
| Delivery Time : | 12WORKING DAYS |
2mm Black EPE Foam With Gold Film For Wood Flooring With Vapor Barrier
Introduction:
EPE is a basic type of flooring underlay, it is an important
moisture barrier and cushioning, it is also a very important
ingredient in producing a floor with a quality sound. With foil
backing will increase the property of thermal plus.
Suitable area:
Laminate floor, wood floor, engineered floor, hardwood floor,
floating floor, sub-floors, etc.
Features:
Creates a vapor/moisture resistant floor
Meets minimum requirements for most brands of flooring
Mold and mildew resistant
Includes adhesive strip and overlap film for linking multiple rolls
cushions flooring

| Description | EPE foam | |||||
| Color | black | |||||
| Density | 22kg/cbm | |||||
| Roll size | 200 sq.ft | |||||
| Thickness | 2mm | |||||
| Coaing | gold film | |||||
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free
of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to
keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section
using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping
film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is
flush up against the other piece of underlayment and on top of the
overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.
|