| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | JINZHOU SHITAN |
| Model Number : | Truck-mounted drilling rig.crawler mounted drilling rig |
| Certification : | ISO |
| Price : | Negotiation |
| Payment Terms : | T/T, Western Union |
| Supply Ability : | 2000 sets per year |
| Delivery Time : | 7-10 days |
Crawler Mounted Rotary Water Small Drilling Rigs Portable Machine For Sale
ST 200 Pneumatic Drilling Rig Introduction
ST 200 Pneumatic Drilling Rig Series Well Drilling Rig is a light, efficient and versatile drilling equipment powered by diesel engine which is from China famous brand. It is mainly suitable for drilling wells, agricultural irrigation wells and other uses, especially for water extraction in mountainous and rock formations engineering.
ST 200 Pneumatic Drilling Rig Technical Parameter
| Model | ST 200 |
| Condition | New |
| Type | Water Well Drilling Rig |
| Power Type | Diesel |
| Place of Origin | China |
| Brand Name | Shitan |
| Usage | Ore |
| Dimension(L*W*H) | 6400MM*2250MM*2700MM |
| Weight | 5800KG |
Certification | ISO9000 |
| Warranty | 1 YEARS |
| Marketing Type | New Product 2020 |
| Drilling diameter | 90-152mm |
| Depth | 25M |
| Rotary speed | 0-90rpm |
| DTH | K40 |
| Drilling Rods | 76*2m+76*3m |
| Air consumption | 13-20m3/min |
| Travelling | 0-2.5km/h |
projects in rock formations in mountainous areas.
Measures taken during the running in period of water well drilling rig.
1. Pay attention to the working load during the running in period.
Generally, the working load during the running in period should not
exceed 80% of the rated working load, and appropriate workload
should be arranged to prevent overheating caused by long-term
continuous operation of the machine.
2. Observe the indication of each instrument frequently. If there
is any abnormality, stop the machine in time to eliminate it
3. Pay attention to strengthen the lubrication of each lubricating
point. It is recommended that during the running in period, each
shift should add lubricating grease to the lubricating point
(except for special requirements).
4. Keep the machine clean and adjust and fasten the loose parts in
time.
5. At the end of the running in period, the machine shall be
compulsorily maintained, inspected and adjusted, and the oil shall
be replaced.
In a word, the requirements for the use and maintenance of water
well drilling rigs during the running in period can be summarized
as: reduce the load, pay attention to inspection, and strengthen
lubrication. As long as attention is paid to and maintenance of
construction machinery during the running in period is carried out
as required, the occurrence of early failures will be reduced, the
service life will be extended, the operation efficiency will be
improved, and more economic benefits will be brought to you.







|
| Company Info. |
| Jinzhou City Shitan Machinery Equipment CO. LTD. |
| Verified Supplier |
| View Contact Details |
| Product List |