Sign In | Join Free | My burrillandco.com
Home > Curtain Walls >

High rise building glass design aluminum frame waterproof structures glass curtain walls

    Buy cheap High rise building glass design aluminum frame waterproof structures glass curtain walls from wholesalers
     
    Buy cheap High rise building glass design aluminum frame waterproof structures glass curtain walls from wholesalers
    • Buy cheap High rise building glass design aluminum frame waterproof structures glass curtain walls from wholesalers
    • Buy cheap High rise building glass design aluminum frame waterproof structures glass curtain walls from wholesalers
    • Buy cheap High rise building glass design aluminum frame waterproof structures glass curtain walls from wholesalers
    • Buy cheap High rise building glass design aluminum frame waterproof structures glass curtain walls from wholesalers
    • Buy cheap High rise building glass design aluminum frame waterproof structures glass curtain walls from wholesalers

    High rise building glass design aluminum frame waterproof structures glass curtain walls

    Ask Lasest Price
    Brand Name : FASEC
    Model Number : OWN
    Certification : ISO9001:2008, SGS, etc.
    Price : USD1000~USD2500 per ton
    Payment Terms : L/C,T/T
    Supply Ability : 600,000 tons per Year
    Delivery Time : Based on client's needs
    • Product Details
    • Company Profile

    High rise building glass design aluminum frame waterproof structures glass curtain walls

    High rise building glass design aluminum frame waterproof structures glass curtain walls

    Product introduction

    The glass curtain wall is the product of the development of modern science and technology, and it is also a significant feature of the modern high-rise building era. The energy-saving way of glass curtain wall is usually to reduce the heat transfer coefficient of the structure by using coated glass, LOW-E glass, heat reflective glass, insulating glass and thermal bridge aluminum profiles, eliminate the "thermal bridge" of the structural system, and reduce the heat loss of air infiltration, It is achieved by improving the sealing performance, etc.

    Specification

    Specifications:
    main steel frameH section steel beam and columns, painted or galvanized, galvanized C section or steel pipe
    Secondary framehot dip galvanized C purline, steel bracing , tie bar , knee brace , edge cover etc.
    Roof panelEPS sandwich panel,glass fiber sandwich panel,rock wool sandwich panel,and PU sandwich panel or steel sheet
    Wall panelSandwich Panel or Corrugated Steel Sheet
    Tie RodCircular Steel Tube
    BraceRound Bar
    Knee BraceAngle Steel
    Roof GutterColor Steel Sheet
    Drawings & Quotation:
    (1) Customized design is welcomed.

    (2) In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.

    We will quote for you promptly.


    Construction Technology:

    1. Preparations for steel structure installation and welding

    The test steels include Q345GJC-Z15 (70mm wall thickness), Q345GJC-Z15 (40mm wall thickness), Q345C (28mm flange thickness), and the welding positions are column-column horizontal welding and column-beam flat welding (including the upper and lower flanges of truss beams). welding), T-shaped corner vertical welding. Groove form and size according to design requirements. After welding, the appearance and ultrasonic inspection were qualified and samples were taken for mechanical and physical tests.

    The test results showed that the tensile strength of the joint reached the standard value of the tensile strength of the base metal, and the joint was bent 180° without cracks. The welding materials and welding equipment used shall meet the national standards and have excellent performance. The devices for cleaning slag, air gouging, electrode drying and heat preservation should be complete and effective.


    2. Welding materials and equipment for manual arc welding and CO2 gas shielded welding

    (1) The electrode should be dried in a high-temperature drying oven, and the number of times the electrode should be dried should not exceed two times.

    (2) The packaging of the welding wire should be in good condition. If it is damaged, the welding wire should be partially discarded if it is contaminated, bent or disordered.

    (3) The purity of CO2 gas should not be less than 99.9% (volume ratio), the water content should be less than 0.05% (weight ratio), and the use of the bottle should be stopped when the high pressure in the bottle is lower than 1MPa.

    (4) The voltage of the welding machine should be normal, the ground wire should be firmly pressed, and the contact should be reliable.


    3. Installation and welding procedures and general regulations

    The general sequence of welding is: pre-welding inspection → preheating and rust removal → installation of welding pad and arc strike plate → welding → inspection

    1. Before welding, check the groove angle, blunt edge, gap and offset amount, and the rust spots, oil stains, iron oxide scale, etc. in the groove and on both sides should be clean.

    2. Preheat. Before welding, use gas welding or a special baking gun to uniformly heat the groove and the base metal within 100mm on both sides, and measure the temperature with a surface thermometer to prevent the temperature from not meeting the requirements or local oxidation of the surface, and preheat the temperature.

    3. Re-check the preheating temperature, if the temperature is not enough, it should be reheated to make it meet the requirements.

    4. When installing the welding backing plate and the arc striking plate, the surface cleanliness requirements are the same as the groove surface. The backing plate and the base metal should be closely attached, and the arc striking plate and the base metal should be welded firmly.

    5. Welding: The weld bead of the first layer should seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. Welding defects should be removed and repaired in time.

    6. A joint must be welded continuously. If the welding is stopped halfway as a last resort, it should be treated with heat preservation and slow cooling. Before re-welding, it should be reheated according to the regulations.

    7. Welding should be stopped in case of rain or snow, and there should be wind shields and canopies around and above the welding joints of components. Welding should be stopped when the wind speed is greater than 5m/s. When the ambient temperature is lower than zero, preheating and post-heating measures should be taken according to regulations.

    8. The carbon structural steel should be cooled to the ambient temperature in the weld, and the low-alloy structural steel should be tested for weld flaw detection 24 hours after completion.

    9. Welders and inspectors should fill in the work record form carefully.

    Related Products

    Our products:steel structural warehouse building, workshop building, Agricultural building (Horse/cattle barn, poultry house), high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, school, office building, prefab house, container house, truss roof warehouses, sandwich panel, corrugated steel sheet, C&Z section steel purlin.

    We can also supply different kind of doors and windows, cranes which is related to project.



    Quality High rise building glass design aluminum frame waterproof structures glass curtain walls for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Hangzhou FAMOUS Steel Engineering Company
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more High Rise Steel Building Construction products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0