Sign In | Join Free | My burrillandco.com
Home > Plastic & Rubber Machinery >

Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200

    Buy cheap Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200 from wholesalers
     
    Buy cheap Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200 from wholesalers
    • Buy cheap Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200 from wholesalers
    • Buy cheap Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200 from wholesalers

    Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200

    Ask Lasest Price
    Brand Name : ShiTan
    Model Number : GK 200
    Certification : ISO9001
    Price : Negotiation
    Payment Terms : T/T, Western Union
    Supply Ability : 2000 sets per year
    Delivery Time : Within 7 days
    • Product Details
    • Company Profile

    Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200

    Engineering Drilling Rig Machine GK 200


    Product Information


    It is a kind of hydraulic feed drilling rig, which has the characteristics of large power, large lifting force and large transmission torque. It is suitable for geological exploration, geological core drilling, small irrigation holes, blasting holes and small water wells of railway, water conservancy, bridge, dam foundation and other buildings. The drilling rig is light in weight, strong in decomposition, easy to move, and suitable for work in plain and mountainous areas.


    Product Technical Data


    Drilling depth200m
    Drilling Diameter91mm,110mm,130mm,150mm,300mm
    Drilling rod diameter50mm
    Drilling Angle90°-75°
    Dimensions(L×W×H)1750×850×1300 (mm)
    Weight880kg/set
    Spindle Speed115, 230, 505, 790, 1010 r/min
    Spindle stroke450mm
    Spindle Dia.Φ59mmx53mmx4350mm Kelly rod
    Upward displacement speed of drilling vertical spindle0.05m/s
    Downward displacement speed of drilling vertical spindle0.067m/s
    Spindle pull-down max15KN
    Spindle lifting capacity max25KN
    Vertical maximum output torque1.5KN.m

    Product Advantages

    1.With hydraulic feeding device, elevated drilling efficiency, reduced labor strength.
    2.The rig is equipped with an upper spherical jaw holding mechanism and hexagonal drive drilling rod which can be replaced without
    shutdown, high efficiency, safe and reliable.
    3. A hole bottom pressure gauge is mounted indicating the pressure in order to control the status inside the hole.
    4.Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains


    Product Applications


    1. Drillings for the general exploration and investigation of solid mineral deposit, engineering geotectonic survey a
    2.Diamond drill bit, alloy drill bit and steel roller drill bit and so on are available for drilling according to different geological structures.
    3.When the final holes are respectively 75mm and 46mm in diameter, the rated hole depths are separately 100m and 180m. The maximum
    of depth may not exceed 110% of that drilled in each hole. The maximum allowable hole diameter is 150 mm.


    The main causes of drill pipe fracture


    1, The bending moment of drill pipe is too large during reaming and pipeline pullback;

    2, The causes of excessive bending moment are as follows: first, the actual curve of the guide hole deviates greatly from the theoretical curve; Second, the hole after reaming is irregular, which makes the pipe form an angle with the reamer and the drill pipe axis.

    Other reasons:

    1, In order to save investment, the directional drilling equipment used by the construction contractor (i.e. Party A) does not match the actual needs of the project construction. The tonnage of the directional drilling equipment is too small, the maintenance is not timely, and the failure rate is high, which makes the directional drilling force uneven. At the same time, the stop and go construction makes the hole forming quality poor, the hole irregular, the drilling tool is easy to lock, resulting in the fracture of the drill pipe;

    2, The selection of reamer model is unreasonable. Failure to select the matching rule model according to the actual geological conditions, resulting in increased drilling torque, increased drill pipe wear and fracture;

    3, When the rock reamer reams or cleans the hole, the drill pipe is not connected at the back, and the reamer swings greatly in the hole, which may cause the drill pipe and the main shaft of the reamer to break;




    Quality Gold Mining Core Engineering Drilling Rig For Sample Collecting Gk 200 for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Jinzhou City Shitan Machinery Equipment CO. LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Engineering Drilling Rig products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0