| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | Harzone |
| Payment Terms : | According to detailed order |
| Delivery Time : | negotiation |
| Certification : | ISO |
Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast Erection Heavy Mechanized Bridge
China Harzone dedicates itself to the following fields:
Design and manufacturing of military bridges and emergency rescue equipment
Design,manufacturing and installation of various kinds of steel bridges and steel structures
Research and re-fitting of special-purpose vehicles and equipment
Engineering contracting
Import and Export trading business
China Harzone has enjoyed a proud history, it must also create a bridge future.
Description of Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast
Erection Heavy Mechanized Bridge:
Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast Erection Heavy Mechanized Bridge is a set of equipment mainly used for bridging small and medium rivers, dry gaps and marshland with a length within 75m and a depth within 5.5m to ensure all sorts of tanks, artilleries and vehicles, and personnel to get across.
Specification of 5 Transport Vehicles Modular Fast Erection Heavy Mechanized Bridge:
| Total weight | 30.6t |
| Folded outline dimension (L*W*H) | 10890*3150*3660 mm |
| Tracked load | 60t |
| Axle load | 13t |
| Roadway width | 3.8m |
| Span length | 15m |
| Max. bridge length | 75m |
| Max. height (from shoes to deck) | 5.5m |
| Erection time for a single span | 12 min |
| Max. current velocity | 2m/s |
| Operator | 7 operators for a single span |


|
| Company Info. |
| CHINA HARZONE INDUSTRY CORP.,LTD. |
| Verified Supplier |
| View Contact Details |
| Product List |