Monofilament Shade Net Manufacturing Machine With Friction Drive
anti hail net
Chenye is professional Raschel Knitting Machine manufacturer which
has plenty of experience in this field.Due to the good quality of
products,the service ,Chenye is leading company in China
Mainland.The products have been sold over 20 countries.
PRODUCT DESCRIPTION
Application:This machine is used to produce Agriculture sunshine
shade net, sports net ,purse net and deep sea aquaculture net and
so on.
Feature:The machine is equipped with oiled eccentric gearing and a
negative yarn let-off system.
Needle Type:Block latch needle ,individual latch needle or Compound
needle
Gauge : E3,E6,E7,E8,E9,E12,E14,E16,E18
Number of bar : 2~8
Working Width : 135", 150", 170", 220", 240". 260"
Take-up manner: 2 rollers with friction drive, center shaft drive,
2 rollers with friction drive, separately-standing, center shaft
drive, separately-standing
Relevant corollary equipment: Warping Machine
Type | Size(L×W×H) | Weight(Kg) | Power(KW) | Speed(rpm) |
Main motor | Inching motor |
SRCP-135 | 4300×2200×2700 | 4700 | 3 | 0.37 | 200-560 |
SRCP-150 | 4900×2200×2700 | 5000 | 3 | 0.37 | 200-560 |
SRCP-180 | 6100×2200×2700 | 7500 | 5.5 | 0.75 | 200-560 |
SRCP-220 | 7300×2200×2700 | 9000 | 5.5 | 1.5 | 200-500 |
SRCP-240 | 8200×2200×2700 | 10500 | 5.5 | 1.5 | 200-500 |
SRCP-260 | 10300×2200×2700 | 12000 | 7.5 | 1.5 | 200-400 |
PRODUCING LINE

MACHINE PICTURE


NET SAMPLE
The machine can produce suitable nets according to different use
scenarios and different raw materials



SHIPPMENT

SERVICE

1.We can dispatch our enginner to your factory to commissioning
machine and trainning your enginner.
2.You can dispatch your enginner come to our factory to study how
to maintance and fix machine.We will arrange netting factory to
teach your enginner study how to produce net for free.
3.Our service team online 24 hours to help you solve problems.
4.Some contries we have office and local enginner to provide you
professional service.
5.If we go to your contry to attend exhibition or visit
customers,we must go to your factory to maintance machine for free.
EXHIBITION

COMPANY INTRODUCTION

A
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your
factory, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets,
hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and
two years guarantee for mechanism, starting from finished
installation.
5.How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing
installation. In case you have any problem, you can contact our
sales at any time. Our engineers will take a solution video
according your description.
6.How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our
technicians 80USD/day for each person.