Sign In | Join Free | My burrillandco.com
Home > Pumps >

Concrete place boom

    Buy cheap Concrete place boom from wholesalers
     
    Buy cheap Concrete place boom from wholesalers
    • Buy cheap Concrete place boom from wholesalers
    • Buy cheap Concrete place boom from wholesalers
    • Buy cheap Concrete place boom from wholesalers
    • Buy cheap Concrete place boom from wholesalers

    Concrete place boom

    Ask Lasest Price
    Brand Name :
    Model Number : HGY
    Certification : CE
    Price : HGY 15--35
    Payment Terms : L/C,T/T
    Supply Ability :
    Delivery Time : 5-8 days
    • Product Details
    • Company Profile

    Concrete place boom

    The placing boom takes advantage of mature manufacturing platform of boom design of truck-mounted concrete boom from famous manufacturers. On the base of accuracy data, the boom structure is optimized through finite element analysis, modal analysis, dynamics simulation analysis and endurance test on model machine. The accuracy of design and data is assured through powerful test and industrial assess means. The same-class weld manufacturing technique is adopted for the boom, the quality is excellent. The placing range can be changed by assembling or disassembling the extension boom to meet different placing working condition more neatly.

    Rotary table and slewing mechanism
    The slewing support is a large-sized bearing which connects the boom and the column, and bears the overturning moment produced by the boom. It is a key component that directly affects the whole machine's safety. The motor redactor is from Comer in Italy. It is in a high speed rate, and long life span and reliable. The hydraulic motor can rotate the slewing table and the boom 365°through the redactor.----,,.Comer,,,.365°

    Tubular column
    The fortified tubular column is adopted. Deformation of the head of the tubular column is 20%~25% less than congener products, it improves the precision for pouring concrete and reduces vibration of the tube.,20%~25%,.The connecting structure parts are optimized, and the rigidity of the column is well and the vibration becomes less.


    Climbing device

    Two climbing modes are for choice: climbing device on floor and climbing device in elevator well. The climbing structure has been optimized and inclined block auxiliary structure is adopted in the tubular column. All can eliminate the error effectively for drilling holes in the floor.

    Hydraulic system
    The power system adopts electrical engine and plunger pump with high pressure, low flux pulse and low noise. Electro-hydraulic stacked directional valves arein good performance and good working condition.Balance valves are from Oil Control, they can support safe guard for boom movement.


    Electric control system
    The advanced and reliable electricity equipment: concrete placing boom has the advanced digital technology control. The electric control box has the flexible outside, excellent manufactory crafts. This equipment runs the high-smart control system reliable, steadily and safely in boom control.
    It's all equipped with electric elements from aboard with high reliability. Electric control is comfortable for wired remote control and wireless remote control are all in.

    Vulnerable part
    Straight pipe adopts special quench heat treatment which makes the pipe's life is longer than 30000 m3
    This series of concrete distributor have reasonable design and reliable structure. The placing structure adopts 360° rotary arm support. The machine is operated by hands and can rotate flexibly. The tower is of aproper height so you can change the placing position freely only by pulling the robe easily. So it is highly efficient, reliable and economic.


    ModelUnitsHGY29C
    PerformanceMax.radius of placing boomm28.9
    Freestanding height (to the joint between the end of the boom and swivel table)
    ()
    m22.7
    Boom articulation°400
    Slewing brake/always close
    Working temperatureºC0ºC~60ºC
    Total weightkg19100
    Counter weightkgHave no
    Power/380V/50HZ
    MotorModel/Y2-160M-4
    PowerkW11
    Hydraulic systemPressureMPa30
    Fluxl/min18
    Hydraulic oilCircumstance temperature35ºC-50ºC35ºC-50ºC/L-HM 68
    Circumstance temperature5ºC-35ºC5ºC-35ºC/L-HM 46
    Circumstance temperature -15ºC-5ºC-15ºC-5ºC/L-HM 32
    Control mode/Short-haul Control /radio remote control/
    Pipeline cleaning/Wet cleaning/Dry cleaning
    /
    Structure of tower body/Tubular column
    Section of tower bodym×m0.75×0.75
    BoomShape/Three hydraulic foldable arms
    R
    Inner diameter of pipelinemmDN125
    End hose″×mm5″×3000
    1st sectionLengthm11.5
    Articulation°0°~82.5°
    2nd sectionLengthm9.3
    Articulation°0°~180°
    3rd sectionLengthm8.1
    Articulation°0°~180°
    ClimbingClimbing mode/By hydraulic cylinder climbing
    Interval of climbingm0.52
    Floor frame/Hole prepared in floor
    Shaft framemHole prepared in floor
    2.0~2.7
    Min.Interval of climbing frameClimbingm3.0
    Placing concretem6.0
    Restm6.0
    ModelUnitsHGY33E
    PerformanceMax.radius of placing boomm33
    Freestanding height (to the joint between the end of the boom and swivel table)
    ()
    m22.7
    Boom articulation°400
    Slewing brake/always close
    Working temperatureºC0ºC~60ºC
    Total weightkg21200
    Counter weightkgHave no
    Power/380V/50HZ
    MotorModel/Y2-160L-4
    PowerkW15
    Hydraulic systemPressureMPa30
    Fluxl/min18
    Hydraulic oilCircumstance temperature35ºC-50ºC35ºC-50ºC/L-HM 68
    Circumstance temperature5ºC-35ºC5ºC-35ºC/L-HM 46
    Circumstance temperature -15ºC-5ºC-15ºC-5ºC/L-HM 32
    Control mode/Short-haul Control /radio remote control/
    Pipeline cleaning/Wet cleaning/Dry cleaning
    /
    Structure of tower body/Tubular column
    Section of tower bodym×m0.75×0.75
    BoomShape/Three hydraulic foldable arms
    R
    Inner diameter of pipeline
    m12.38
    Articulation°0°~82.5°
    2nd sectionLengthm10.93
    Articulation°0°~180°
    3rd sectionLengthm9.69
    Articulation°0°~180°
    ClimbingClimbing modeBy hydraulic cylinder climbing

    Interval of climbingm0.52
    Floor frame/Hole prepared in floor
    Shaft framemHole prepared in floor
    2.0~2.7
    Min.Interval of climbing frameClimbingm3.0
    Placing concretem6.0
    Restm6.0




    Quality Concrete place boom for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: QINGDAO SISOUL GRUOP
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0