| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | Sussman |
| Model Number : | SS-DL |
| Certification : | CE, ISO, SGS |
| Price : | negotiable |
| Payment Terms : | L/C, T/T |
| Supply Ability : | 12 sets/ month |
| Delivery Time : | 55 working days after accepting the advanced payment |
Roof and wall panel double layer roll forming machine
Technical Parameter
Item NO | Description | Offered specification |
1.1 | Rolling speed | UP to 16 m/min(not include cutting time) |
1.2 | Rolling thickness | 0.21-3.0mm |
1.3 | Raw material | Color painted coils |
1.4 | Dimension | About 8000×1600×1200(mm) |
1.5 | Effective width | 836mm |
1.6 | Feeding Coil width | 1000mm |
1.7 | Roller stations | About 18 stations |
1.8 | Roller material | 45#forge steel, coated with chrome |
1.9 | Shaft diameter | Φ76mm |
1.10 | Transmission | By chain 1.2 inch |
| 1.11 | Material of chain | 45# forged steel with frequency quenching, 12A |
1.12 | Material of cutting | Cr12Mov with quench HRC58-62° |
1.13 | Tolerance | 10m+-1.5mm |
| 1.14 | Hydraulic station | 4kw |
Main Components
Commodity & Description | Quantity |
5T manual uncoiler | 1 set |
Leveing guiding | 1 set |
Servo feeding device | 1 set |
Main roll forming machine | 1 set |
Hydraulic station | 1 set |
Cutting device | 1 set |
Finished products tabel | 1 set |
PLC control system | 1set |
Out tables | 2 sets |
Spare parts | 1 set |
Working Flow of Roll Forming Machine
A.Passive
Decoiler..........................................................
B.Servo Feeding Applicator............................................
C.Hydraulic/Press Punching...........................................
D.Roll Forming Unit.........................................................
E.Hydraulic Cutting.........................................................
F.Output Table................................................................

Standard Profile of Product

Loading pictures

After-sale Serive
- After machine arrive the destination, by the request of the buyer
, the seller will provide 1 technical engineer to guide
installation and training , and the buyer should give the technical
person with full cooperated.
- Installation period: about 7 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
|
| Company Info. |
| Sussman Machinery(Wuxi) Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |