Sign In | Join Free | My burrillandco.com
Home > Metal & Metallurgy Machinery Parts >

Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test

    Buy cheap Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test from wholesalers
     
    Buy cheap Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test from wholesalers
    • Buy cheap Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test from wholesalers
    • Buy cheap Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test from wholesalers
    • Buy cheap Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test from wholesalers
    • Buy cheap Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test from wholesalers

    Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test

    Ask Lasest Price
    Brand Name : HD BOILER
    Model Number : Superheater and Reheater
    Certification : ISO9001 , SGS , TUV , ASME , EN
    Price : Negotiable
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 1500 Tons / Month
    Delivery Time : 50 ~ 100 Days
    • Product Details
    • Company Profile

    Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test

    Carbon steel coils superheater and reheater processing plant ball passing U-bending ovality test


    Description


    1The efficiency of the steam cycle is improved by higher steam pressure and tempera­ture as well as reheating.
    2Both superheating and reheating of steam have to be as high as possible. At a steam pressure of 120 bar and higher, the cycle efficiency improves by —1% for every 20°C rise in superheat.
    3Therefore, high superheats are desired for each band of pressure consistent with the metallurgy of the turbine.

    Superheater(SH)


    In a subcritical boiler, the SH is between the main-steam header and the steam drum and consists of
    • Saturated tubes that transport steam from the drum to the SH inlet header (when the SH tubes are not directly connected to the drum)

    • Superheater banks with their respective inlet and outlet headers

    • Attemperator station for STC
    • Main-steam header with all fittings and terminating with the main-steam stop valve (MSSV)
    Steam from the steam drum flows toward the main-steam header, and there should be no valve between the two to ensure flow in SH tubes under all conditions to prevent over­heating and failure.

    Reheater(RH)


    Reheating of steam involves withdrawal of partly expanded steam (at the end of the high — pressure cylinder of the turbine), taking it back to the boiler in cold reheat pipes, heating to the same or higher temperature as the superheated steam, and returning to the turbine in hot reheat pipes. In terms of hardware, an RH system comprises


    • Cold reheat pipe from turbine to boiler
    • Safety valves on the cold reheat pipe
    • Emergency spray-water attemperator system on a cold reheat pipe or interconnect­ing pipe
    • Reheater bank complete with inlet and outlet headers

    • Hot reheat pipe from boiler to turbine


    Superheater and Reheater Design Principles


    1.Superheater and reheater are the tube banks that attain the highest temperatures in a boiler and consequently require the greatest care in the design, fabrication, and O&M to ensure that the permissible metal temperatures are never exceeded.


    2.The final sec­tions of both SH and RH must be placed in the highest gas temperatures, which calls for adopting the most appropriate high-temperature alloy for the tubing from consider­ations of the following information.


    • Metal temperatures

    • Fouling due to ash compounds

    • Corrosion due to salts in ash

    The three most important aspects of the design of both SH and RH are:


    1Uniform distribution of steam and gas across all the sections to minimize unbal­ance of flows.
    2Optimally high steam velocity in all the tubes to keep the metal temperatures as low as possible.

    Product


    Quality Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U-Bending Ovality Test for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang HuaDong Boiler Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Superheater And Reheater products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0