Sign In | Join Free | My burrillandco.com
Home > Steel Pipes >

lsaw steel pipe/ galvanized steel pipe

  • Product Details
  • Company Profile

lsaw steel pipe/ galvanized steel pipe

Main details


Standard:GB/T3091 – 2001, BS1387 – 1985, DIN EN10025, EN10219, JIS G3444:2004, ASTM A53, ASTM A53: GR. A , GR. B,
Zinc Coating275 – 600g /m2
Steel Grade:Q195, Q235, Q345, S235, S235JR, S355JR.STK400 /500.
Packing:The pipe can be packed in bundles with several steel strips, Two tags on each bundle, Wrapped in waterproof paper
Test:Chemical Component Analysis, Mechanical Properties (Ultimate tensile strength, Yield strength, Elongation), Technical Properties (Flattening Test, Bending Test, Blow Test, Impact Test), Exterior Size Inspection, Hydrostatic Test, X-ray Test. Third party inspection:SGS, BV, Lloyds etc.
Usage:Used for low pressure liquid delivery, such as water, gas, and oil; it can also be used to make fence, greenhouse and other structures.

Material Quality of galvanized pipe


ElementsChemical Composition%Mechanical Property
MaterialC%Mn%S%P%Si%Yield PointTensile StrengthElongation
 (Mpa)(Mpa)(%)
Q1950.06-0.120.25-0.50<0.050<0.045<0.30>195315-43032-33
Q2150.09-0.150.25-0.55<0.050<0.045<0.30>215335-45026-31
Q2350.12-0.200.30-0.70<0.045<0.045<0.30>235375-50024-26
Q345<0.201.0-1.6<0.040<0.040<0.55>345470-63021-22

Size of our pipe


Outer DiameterWall ThicknessLength
Inchmmmmmeter
1/2"21.3mm0.6mm-3.0mm0.3m-12m
3/4"26.9mm0.6mm-3.0mm0.3m-12m
1"33.4mm1.0mm-3.0mm0.3m-12m
1-1/4"42.3mm1.0mm-4.0mm0.3m-12m
1-1/2"48.3mm1.0mm-4.0mm0.3m-12m
2"60.3mm1.5mm-4.0mm0.3m-12m
2-1/2"76.1mm1.5mm-4.0mm0.3m-12m
3"88.9mm1.5mm-9.5mm0.3m-12m
4"114.3mm2.0mm-9.5mm0.3m-12m
5"141.3mm3.0mm-9.5mm0.3m-12m
6"168.3mm3.0mm-12.0mm1.0m-12m
8"219.1mm3.2mm-12.0mm1.0m-12m
10"273mm3.2mm-12.0mm1.0m-12m
12"323.8mm6.0mm-15.0mm1.0m-12m
14"355.6mm8.0mm-15.0mm1.0m-12m
16"406.4mm8.0mm-20.0mm1.0m-12m

Products




FAQ
1. How to buy your ideal products?
A: You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.
30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantity.
Generally, the delivery time will be within 12 to 15 days.
4. How to install after the goods destination?
A: We will provide installation instruction and video for you. Technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.

Quality lsaw steel pipe/ galvanized steel pipe for sale
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
Send your message to this supplier
*From:
Your email address is incorrect!
*Subject:
Your subject must be between 10-255 characters!
*Message:
For the best results, we recommend including the following details:
  • --Self introduction
  • --Required specifications
  • --Inquire about price/MOQ
Your message must be between 20-3,000
Yes! I would like your verified suppliers matching service!
Send your message to this supplier
 
*From:
*To: Hebei Lufeng Piping Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Explore more Steel Pipes & Tubes products from this supplier
Find Similar Products By Category:
Inquiry Cart 0