| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | Xianheng |
| Model Number : | MFA-XG-080 |
| Certification : | ISO9001:2015 |
| Price : | USD $0.1-$1.99 |
| Payment Terms : | T/T, Western Union, MoneyGram |
| Supply Ability : | 50000 pcs per week |
| Delivery Time : | Samples 7-10 days, Mass production 20-25 days |

High-Performance Metal Frame Parts for Critical Systems in Aerospace Defense Automotive and Industrial Machinery
Description Of High-Performance Metal Frame Parts for Critical Systems in Aerospace Defense Automotive and Industrial Machinery
High-Performance Metal Frame Parts for Critical Systems in Aerospace, Defense, Automotive, and Industrial Machinery are components engineered to meet stringent performance requirements in extreme environments. These parts are typically fabricated from advanced metallic materials, such as titanium alloys, nickel-based superalloys, high-strength steels, and magnesium alloys, which offer exceptional mechanical properties, thermal stability, and corrosion resistance.
Material Of High-Performance Metal Frame Parts for Critical Systems in Aerospace Defense Automotive and Industrial Machinery
Production Capability
Secondary Operations
Surface Operations | * Deburring work by machines,then by hands; * As long as you need no scratches on the products, we can use the film protected material for products during production; * Remove sharps of the products; * Ultrasonic cleaning after production. |
Surface Treatments | Powder Coating, Polishing, Brushing, PVD Plating, PVC Coating,
Ceramic Coating, Chrome Plating, Nickel Plating, Tin Plating, Copper Plating, Silver Plating, Sandblasting, Anodizing, Dacromet, Baking Varnish, Electrophoresis Coating, Zinc Plating, Hot Dip Galvanizing. |
| LOGO Printing | Laser Engraving, Silk-screening etc |
| Assembly Service | Yolanda provide products assembly service after each component production. |
Custom Packaging | * Design packaging according to your products; * Make the packagings according to your requests; * Print your LOGO on the packaging as long as you need; * Other request according to your need. |
Quality Control
1. Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2. Checking the details before the production line operated
3. Have full inspection and routing inspection during mass
production---In process quality control(IPQC)
4. Checking the goods after they are finished---- Final quality
control(FQC)
5. Checking the goods after they are finished-----Outgoing quality
control(OQC)

Advantages
Enhanced Performance and Reliability:
High-performance metal frame parts are engineered to withstand
extreme loads, temperatures, and environmental conditions, ensuring
reliable operation in critical systems. For example, titanium alloy
components in aerospace applications can endure temperatures
exceeding 600°C while maintaining structural integrity.
Weight Reduction Without Compromising Strength:
The use of lightweight materials like titanium and magnesium alloys
significantly reduces the overall weight of the system, improving
fuel efficiency and payload capacity. In automotive applications,
magnesium alloy components can reduce vehicle weight by up to 30%
compared to traditional steel parts.
Improved Design Flexibility:
Advanced manufacturing techniques, such as additive manufacturing,
enable the production of complex geometries that are difficult or
impossible to achieve with conventional methods. This allows for
the integration of multiple functions into a single component,
reducing assembly time and costs.
Cost-Effectiveness Over the Lifecycle:
Although high-performance metal frame parts may have a higher
initial cost, their superior durability and reduced maintenance
requirements result in lower lifecycle costs. For example,
nickel-based superalloy components in gas turbines require less
frequent replacement compared to traditional materials, reducing
downtime and operational expenses.





FAQ
1. How can I get the price? - We usually quote within 24 hours after we get your inquiry (except weekend and holidays). If you are urgent to get the price, please email us or contact us in other ways so that we can offer you a quote.
2. Can I buy samples? - Yes. Please feel free to contact us.
3. What is your lead time? - It depends on the order quantity and the season you place the order. Usually we can ship within 7-15 days for small quantity, and about 30 days for large quantity.
4. What is your payment term? - T/T, Western Union, MoneyGram, and Paypal. This is negotiable.
5. What is the shipping method? - It could be shipped by sea, by air, or by express (EMS, UPS, DHL, TNT, FEDEX etc). Please confirm with us before placing orders.
6. How do you make our business long-term and good relationship? - We keep good quality and competitive price to ensure our customers benefit. Furthermore, we respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
|
| Company Info. |
| Shenzhen Xianheng Technology Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |