| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | XCMG |
| Model Number : | XGC 300t |
| Price : | Negotiable Price |
| Payment Terms : | L/C,T/T |
| Supply Ability : | Supply According to Customer Needs |
| Delivery Time : | According to Order Confirmation |
Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m
Lightweight main boom working condition arm raising table
Table of light main boom without arm end pulley (LB/1)
LB/1 | Counterweight combination: turntable counterweight (t) + vehicle body counterweight (t) | |||
Lightweight main boom assembly | 115+40 | 110+40 | 100+40 | 90+40 |
LB65.5 | ◎ | ◎ | ◎ | ◎ |
LB68.5 | ◎ | ◎ | ◎ | ◎ |
LB71.5 | ◎ | ◎ | ◎ | ◎ |
*LB74.5 | ◎ | ◎ | ◎ | ◎ |
*LB77.5 | ◎ | ◎ | ◎ | ◎ |
*LB80.5 | ◎ | ◎ | ◎ | ◎ |
**LB83.5 | ◎ | ◎ | ◎ | ◎ |
**LB86.5 | ◎ | ◎ | ◎ | ● |
**LB89.5 | ◎ | ◎ | ◎ | ● |
**LB92.5 | ◎ | ◎ | ● | ● |
**LB95.5 | ● | ● | ● | ● |
**LB98.5 | ● | ● | ● | × |
**LB101.5 | ● | ● | ● | × |
**LB104.5 | ● | ● | × | × |
Lightweight main boom with boom end pulley (LBS/1 & LBS/2) working condition lifting table
LBS/1 & LBS/2 | Counterweight combination: turntable counterweight (t) + vehicle body counterweight (t) | |||
Lightweight main boom assembly | 115+40 | 110+40 | 100+40 | 90+40 |
LBS65.5 | ◎ | ◎ | ◎ | ◎ |
LBS68.5 | ◎ | ◎ | ◎ | ◎ |
LBS71.5 | ◎ | ◎ | ◎ | ◎ |
*LBS74.5 | ◎ | ◎ | ◎ | ◎ |
*LBS77.5 | ◎ | ◎ | ◎ | ◎ |
*LBS80.5 | ◎ | ◎ | ◎ | ● |
**LBS83.5 | ◎ | ◎ | ◎ | ● |
**LBS86.5 | ◎ | ◎ | ● | ● |
**LBS89.5 | ◎ | ◎ | ● | ● |
**LBS92.5 | ◎ | ● | ● | × |
**LBS95.5 | ● | ● | ● | × |
**LBS98.5 | ● | ● | × | × |
**LBS101.5 | ● | ● | × | × |
**LBS104.5 | ● | × | × | × |
Notes: 1. "◎" - can raise the arm. "●" - need wedges to assist in raising the arm. "×" - cannot raise the arm, not allowed to use.
2. "*" light main arm combination requires a 1.25m waist rope. "**" light main arm combination requires 1.25m and 2.62m waist ropes.
3. The tower arm rear pull plate needs to be removed from each arm section of the main arm, and the tower arm guide pulley needs to be installed on the main arm reducer.
4. When raising the arm, please place the crawler drive wheel behind the vehicle body.
|
| Company Info. |
| Shandong Tengfei Hoisting Engineering Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |