Sign In | Join Free | My burrillandco.com
Home > Tennis >

New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

    Buy cheap New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m from wholesalers
     
    Buy cheap New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m from wholesalers
    • Buy cheap New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m from wholesalers

    New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

    Ask Lasest Price
    Brand Name : Zhonghai Bailey Bridge
    Model Number : CB200/CB321
    Certification : IS09001, CE
    Price : USD 95-450
    Payment Terms : L/C,D/P,T/T
    Supply Ability : 60000ton/year
    Delivery Time : 8-10 work days
    • Product Details
    • Company Profile

    New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

    New Type Bailey Bridge/with Factory Price Ce Bailey Bridge


    When building a 321-type Bailey bridge in mountainous areas, it is crucial to ensure that the bridge base is stable. Here are some specific methods and precautions:


    1. **Foundation bearing capacity inspection**
    - **Soil condition assessment**: Before building a Bailey bridge, the soil conditions at the bridge base must be assessed to ensure that the soil is solid. If the soil bearing pressure does not meet the design requirements, the foundation under the bridge base must be expanded or reinforced.
    - **Angle of repose pile setting**: When the bank slope is steep (greater than the angle of repose), the position of the angle of repose pile must be calculated and set according to the formula.


    2. **Foundation reinforcement method**
    - **Enlarge the foundation**: If the soil conditions are not good, the bearing capacity can be increased by expanding the foundation area.
    - **Concrete reinforcement**: Pour the concrete foundation at the bridge base to ensure that the foundation is deep into the stable stratum and provides sufficient support.
    - **Pile foundation reinforcement**: When necessary, the method of driving pile foundation can be used to enhance the stability of the foundation.


    3. **Bridge seat design and construction**
    - **Bridge seat axle beam**: The bridge end column is supported on the bridge seat axle beam, which is divided into multiple sections. The appropriate bridge seat is selected according to the number of bridge rows.
    - **Seat plate setting**: The seat plate should be set at the seat plate axis position, and the seat plate position should be properly excavated to reduce the bridge deck elevation, generally making the height difference between the bridge deck and the road surface no more than 30 cm.


    4. **Precautions during construction**
    - **Construction personnel safety**: Construction personnel must wear safety helmets and safety belts, and it is strictly forbidden to work on the rack after drinking. When using a crane to lift and remove Bailey piers, a special person should be assigned to direct the crane, and it is strictly forbidden for the crane boom to collide with the Bailey beam and its foundation.
    - **Roller setting**: Rollers are set at the marked roller position, and a sample plate should be placed underneath. Only one row of trusses is allowed to pass through each rock, and the distance between the rock and the bearing plate is about 1.0 meter, and at least not less than 0.75 meter.

    Through the above measures, the stability of the bridge base foundation can be ensured when building a Type 321 Bailey bridge in mountainous areas, thereby ensuring the safety and stability of the bridge.



    Specifications:

    CB321(100) Truss Press Limited Table
    No.Lnternal ForceStructure Form
    Not Reinforced ModelReinforced Model
    SSDSTSDDRSSRDSRTSRDDR
    321(100)Standard Truss Moment(kN.m)788.21576.42246.43265.41687.533754809.46750
    321(100)Standard Truss Shear (kN)245.2490.5698.9490.5245.2490.5698.9490.5
    321 (100) Table of geometric characteristics of truss bridge(Half bridge)
    Type No.Geometric CharacteristicsStructure Form
    Not Reinforced ModelReinforced Model
    SSDSTSDDRSSRDSRTSRDDR
    321(100)Section properties(cm3)3578.57157.110735.614817.97699.115398.323097.430641.7
    321(100)Moment of inertia(cm4)250497.2500994.4751491.62148588.8577434.41154868.81732303.24596255.2

    ​​

    CB200 Truss Press Limited Table
    NO.Internal ForceStructure Form
    Not Reinforced ModelReinforced Model
    SSDSTSQSSSRDSRTSRQSR
    200Standard Truss Moment(kN.m)1034.32027.22978.83930.32165.44244.26236.48228.6
    200Standard Truss Shear (kN)222.1435.3639.6843.9222.1435.3639.6843.9
    201High Bending Truss Moment(kN.m)1593.23122.84585.56054.33335.86538.29607.112676.1
    202High Bending Truss Shear(kN)3486961044139234869610441392
    203Shear Force of Super High Shear Truss(kN)509.8999.21468.21937.2509.8999.21468.21937.2

    ​​

    CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
    StructureGeometric Characteristics
    Geometric CharacteristicsChord Area(cm2)Section Properties(cm3)Moment of Inertia(cm4)
    ssSS25.485437580174
    SSR50.96108751160348
    DSDS50.96108751160348
    DSR176.44163121740522
    DSR2101.92217502320696
    TSTS76.44163121740522
    TSR2127.4271852900870
    TSR3152.88326253481044
    QSQS101.92217502320696
    QSR3178.36380594061218
    QSR4203.84435004641392



    Advantage

    Possessing the features of simple structure,
    convenient transport, speedy erection
    easy disassembling,
    heavy loading capacity,
    great stability and long fatigue life
    being capable of an alternative span, loading capacity


    Quality New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m for sale
    • Haven't found right suppliers
    • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
    • And this service is free of charge.
    • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
    Submit Buying Request
    Send your message to this supplier
    *From:
    Your email address is incorrect!
    *Subject:
    Your subject must be between 10-255 characters!
    *Message:
    For the best results, we recommend including the following details:
    • --Self introduction
    • --Required specifications
    • --Inquire about price/MOQ
    Your message must be between 20-3,000
    Yes! I would like your verified suppliers matching service!
    Send your message to this supplier
     
    *From:
    *To: Jiangsu Zhonghai Bridge Equipment Co.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Explore more Bailey Bridge products from this supplier
    Find Similar Products By Category:
    Inquiry Cart 0