Erection Length 17-51m Mechanized Bridge Emergency Steel
|
...a set of mechanized bridge with big single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of...
CHINA HARZONE INDUSTRY CORP.,LTD.
|
Large Span Emergency Mechanized Bridge 22.5m Length Energy Saving
|
... bridge erecting vehicle, which has the characteristics of fast installed speed, high mechanization degree, self-propelled, self-withdrawn and so on. It can quickly install bridges in areas with a span of up to 19 meters and a passable width of 3.3...
EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
|
GB355B Steel Bailey Bridge Convenient Transfer Emergency Mechanized Bridge For Sale
|
...Bridge Convenient Transfer Emergency Mechanized Bridge For Sale Introduction of Emergency Mechanized Bridge: Emergency mechanized bridge is usually composed of emergency bridge and emergency bridge erecting vehicle, which has the characteristics of fast installed speed, high mechanization degree, self-propelled, self-withdrawn and so on. It can quickly install bridges......
EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
|
China highway bridge erecting machine, 160t / 40m bridge erecting machine, engineering crane, bridge erecting machine, b
|
..., passing through the hole is a step of beam erecting construction, which is also a very important step. Therefore, the bridge erecting machine needs to pay attention to many matters when passing through the hole. Some main matters are listed below...
Henan Huanghe explosion proof crane Co., Ltd
|
5m/Min Travel Highway Bridge Launching Crane Wire Rope Sling Type
|
... Product Description The capacity:60-200ton The span : 20-50m Control Mode: Pendant, Remote Control and Cabin Control. Bridge Launching Crane is used to erect the prestressed concrete girder with span 50m and 51m. The assembly of...
Henan Dowell Crane Co., Ltd.
|
Bailey bridge/Bailey Suspension bridge/Quick erection/short construction time and reusable components
|
... tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing te advantages of quick erection,short construction time and te bridge components can be used repeatedly;The span length is adapted to 60-300m....
Zhenjiang Great Wall Group Co.,Ltd
|
Modular Bailey Bridge Panel , Bailey Bridge Components S355JR Or ASTM A572 Equivalent Mechanical Performance
|
... panel combined into bridge system that can be diassembled and rapidly erected. The whole bridge is welded with high-tensile strength steel S355JR, ASTM A572 GR50 or even Q460MPA material. The girder is light weight composite ......
Hangzhou USEU Metal Manufacturing Company
|
Highway and Railway Bridge Construction Gantry Crane for Precast Concrete Bridge Girder Erection
|
... sideways to do common lifting and unloading works, this kind of crane is composed of bridge, support legs, crane traveling organ, electric equipment, strong lifting winch, the frame adopts boxed-type welding mechanism, crane traveling mechanisms are...
Henan Jingong Crane Co.,Ltd.
|
High Stablity Bailey Suspension Bridge Anti Skid Surface For Longest Spans Rive
|
... tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing te advantages of quick erection,short construction time and the bridge components can be used repeatedly;The span length is adapted to 60-300m....
Zhenjiang Great Wall Heavy Industry Technology Co.,Ltd
|
Steel Bailey Bridge,Painted, Compact 200 model / Compact 100,9~60m
|
... can be dissembled and rapidly erected . The whole bridge is welded with high-tensile strength steel. The girder is lightweight composite panels and the panels are connected by panel connection pins. The conversion between the parts is ......
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
|
