| Sign In | Join Free | My burrillandco.com |
|
... design ensures reliable performance in high-pressure environments, which is essential for safe drilling. Furthermore, the system integrates seamlessly with BOP stacks and other well control equipment. This ...
Hydraulic Control Box - Pushing Control Box With different variety, our hydraulic control boxes are widely used for drilling rig and workover rig. Only same kinds of control boxes are shown on the photos. Accor...
...Controller Module Product Details: The GE IS215UCVHM06A is a Universal Controller Module, a key component in GE’s Mark VI Series control systems, designed to manage critical operations in industrial applicat...
...Controller Module Product Details: The GE IS415UCVHH1A is a Universal Controller Module, a key component in GE’s Mark VI Series control systems, designed to manage critical operations in industrial applicati...
... according the rubber seal packing. The BOP plunger of the blowout system is used for the sealing of the downhole pressure after the wire break.The seal packing are both available with manual and hydraulic c...
...Control Hydraulic Stuffing Box Wireline Pressure Control is a surface pressure control equipment using on slickline operation to seal off the wire, and the sealing of the wire according the rubber seal packi...
API 16 A Blowout Preventer Parts Shear Bore Ram Shear Ram/Variable Ram Products Description : Ram-type blow out preventer is important equipment used in oil drilling operations. Variable bore ram-type blowout p...
Cathead Control Box With different variety, our hydraulic control boxes are widely used for drilling rig and workover rig. Only same kinds of control boxes are shown on the photos. According to requirements fro...
Hydraulic Single Ram Blowout Preventer / Wireline BOP For Well Control The hydraulic double RAM blowout preventer can seal casing pipe and drilling pipe when it has drilling tools inside the well bore. And it c...
...controlled by PLC with touch screen. 2. Four pillars to fix the mold more stable. 3. Adopt hydraulic system to drive the movement of the mould 4. high speed thermoforming machine can work perfectly for PP, P...
Oil Wellhead Equipment, Single and Double Ram BOP for Well Control The ram blowout preventer is one of the key elements in the well control system. It is mainly used to control the well head pressure during suc...
...BOP,The pump in tee connection thread is used to connect the wellhead manifold to provide a path for large flow. NPT thread hole on the other side of the ......
...Control Tee WPCE Crossover The Pump-in Tee/Sub is a necessary part of a wireline rig-up design, normally located above the wellhead and below the wireline BOP , the pump-in tee / pump sub is used to provide ...
... according the rubber seal packing. The BOP plunger of the blowout system is used for the sealing of the downhole pressure after the wire break.The seal packing are both available with manual and hydraulic c...
... according the rubber seal packing. The BOP plunger of the blowout system is used for the sealing of the downhole pressure after the wire break.The seal packing are both available with manual and hydraulic c...
... according the rubber seal packing. The BOP plunger of the blowout system is used for the sealing of the downhole pressure after the wire break.The seal packing are both available with manual and hydraulic c...
...Control I. Introduction: Hydraulic Stuffing Box is a surface pressure control equipment using on slickline operation to seal off the wire, and the sealing of the wire according the rubber seal packing. The B...
API 6A Oilfield Riser Flange, Spacer Adapter Spool, Casing Tubing Spool Or Drilling Spool API 6A Oilfield Riser Flange, Spacer Adapter Spool, Casing Tubing Spool Or Drilling Spool Description of Spacer Spool: A...
13-5/8" X 5M To 18-3/4" X 15M API 6A Double Studded Adapter/DSA Flange For Wellhead 13-5/8" X 5M To 18-3/4" X 15M API 6A Double Studded Adapter/DSA Flange For Wellhead Description of Double Studded Adapter Flan...