| Sign In | Join Free | My burrillandco.com |
|
...warehouse,workshop,yard to conduct lifting and loading of materials. The crane is composed of bridge,travelling mechanism,trolley,electric equipment and grab,It is heavy duty type overhead crane that satisfi...
Top Quality 10 Ton Double Girder Overhead Bridge Crane with Trolley Electric Hoist Brief Introducion: This LH model electric hoist bridge crane has the advantages of compact shape dimension, low building headro...
Construction Machinery Crane Spare Parts Supply Crane Wheel Set For Bridge Crane Product description Crane wheels are replaced because of flange wear, flange breakage, and mechanical overloads characterized by ...
... .Top quality polyurethane buffer. 3). Crane traveling limit switch and lifting limit switch. 4) .Low voltage protection function. 5). Emergency stop system. 6) .Current overload protection function. Specifi...
...Crane 30 Ton KSSL Romote Control Double Girder Bridge Crane European Double girder overhead crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are...
... device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder. Assemble the moving table on the outside of the two main girder, one side is prepare ...
...Crane 30 Ton KSSL Romote Control Double Girder Bridge Crane European Double girder overhead crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are...
... device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder. Assemble the moving table on the outside of the two main girder, one side is prepare ...
...Bridge Crane: Specification of QE Type 5~16t Double Handcart Hanger Bridge Crane : QE Type 5~16t Double Handcart Hanger Bridge Crane with two trolleys that works simultaneously or separately, this crane is s...
... or separately, this crane is suitable to lift long materials (wood, paper tube, pipe and bar) in workshops or outdoor stores in factories and mines. Working conditions of QE Type Double Handcart Hanger Brid...
... or separately, this crane is suitable to lift long materials (wood, paper tube, pipe and bar) in workshops or outdoor stores in factories and mines. Working conditions of QE Type Double Handcart Hanger Brid...
...Bridge Crane 5 ton: Specification of QE Type Double Handcart Hanger Bridge Crane 5 ton : Double Handcart Hanger Bridge Crane with two trolleys that works simultaneously or separately, this crane is suitable ...
...separately, this crane is suitable to lift long materials (wood, paper tube, pipe and bar) in workshops or outdoor stores in factories and mines. Working conditions of QE Type Double Handcart Hanger Bridge C...
20 Ton Box Girder Overhead Bridge Crane With Top Running Trolley Introduction: 1. Lightweight and Modular Design, Overall height is 20%~25% lower than traditional cranes; 2. Self-weight is lighter by 20%~30%; 3...
...trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder.Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble a...
... methods,ground control, cab control, wireless remote control,etc 450/80t variable speed double beam overhead crane can be...
...Bridge Crane System With Grab For Lifting Scrap Iron 1. Intrudiction: This type of overhead crane consists of a girder frame, a crane traveling device, and a trolley with a lifting mobile device. The main be...
.... There are Pave the rail for the trolley move on the main girder. Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble and maintenance the crane move device,...
..., Crane travel device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder.Assemble the moving table on the outside of the two main girder, one sid...
...trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder.Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble a...