| Sign In | Join Free | My burrillandco.com |
|
6pt Concrete Scarifier Blades Tungsten Tipped Cutters For Floor Surfacer Scarifying Machine 1) Specification: Part Number Description O.D I.D Width Tip Suitable for Scarifier / Planners Y1006 TCT 6pt 56.6mm 2.2...
YG Round Stock Grabs Lifting and transporting steel and concrete pipes Pick up tubes, pipes and rolls or similar round stock material with a diameter up to 320mm Model WLL (ton) Jaw opening (mm) Weight kg 0.5t ...
10 - 30 KN Wire Rope Tightening Tool Hand Ratchet Tightener Large Drum Hub Application This series of hoist is mainly used in the large and middle sized concrete, steel structure and mechanical equipment insta...
... material adopts right angle aluminum titanium alloy section, rivet joint makes, portable and durable. About us: Suntech Power Tools, which located in the...
...Concrete , Polishing the Concrete Countertop and Floor Diamond polishing pad for concrete is widely used for polishing concrete floor and the coarse surface of concrete, enables to meet the needs of you in d...
...Tools System Shooting Nail Gun Concrete steel Nails Gun This is versatile,safe,reliable and powerful tool can use nearly all heavy,medium or light-duty fasteners,it uses 165A Gas ,optimum antispall and anti-...
... force from a rotary drilling rig, making loose soil of pile diameter compacted. After reaching the predetermined design depth, the displacement tool continues to turn clockwise while being extracted, concre...
...Tools Series-2 Full Displacement Pile (FDP) construction method displaces the material of pile diameter laterally into the adjacent ground with a spindle-type boring tool with spiral blades through clockwise...
...Tool Series-3 Full Displacement Pile (FDP) construction method displaces the material of pile diameter laterally into the adjacent ground with a spindle-type boring tool with spiral blades through clockwise ...
... force from a rotary drilling rig, making loose soil of pile diameter compacted. After reaching the predetermined design depth, the displacement tool continues to turn clockwise while being extracted, concre...
...Tools Series-2 Full Displacement Pile (FDP) construction method displaces the material of pile diameter laterally into the adjacent ground with a spindle-type boring tool with spiral blades through clockwise...
...Tool Series-3 Full Displacement Pile (FDP) construction method displaces the material of pile diameter laterally into the adjacent ground with a spindle-type boring tool with spiral blades through clockwise ...
... stamping. 3, tanks and docking blade welding through large rotary tooling and high accuracy. 4, hydraulic systems are all used imported components, compact structure and superior performance. 5, complete mo...
Concrete Floor Grinding Machine 700mm Grinding Width HW-G7, 15hp, grinding width 700mm, 4 grinding plates, 12 pieces of diamond tools. HW-G7 has the quickest motor speed, from 300-2000rpm. The motor is 15hp, an...
11 Inch Concrete Grinding Machine With Vacuum Port For Dust Free Operation Grinding floor edge; Grinding samll area; For 220v and 110v; Quick change of diamond pad, no need for tools; Very easy for transportati...
Concrete Floor Planer With Cutting Tools Tungsten Carbide Cutters Floor scarifier, also called floor milling machine, or floor removal machine, is used to remove the floor surface coatings and makes uneven surf...
... weigher. Temperature and moisture sensor To ensure concrete and prefabricated parts quality, sensors of temperature and moisture made in Bikotronic of German can be selected Hydraulic Coupling High Pressure...
...Concrete Mixer Small Space Required PMC330 Operation Instruction The instruction must be followed during operation 1. Do not run over loaded 2. Discharge material in the trough after an emergency stops. Star...
...Concrete Mixer 1-3 Unloading DoorsPMC500 Operation Instruction The instruction must be followed during operation 1. Do not run over loaded 2. Discharge material in the trough after an emergency stops. Start ...
...Discharge material in the trough after an emergency stops. Start with load is forbidden; 3. After each shift, clean the trough, tools, check the tightness of nuts, and open and close the discharging door Sev...