| Sign In | Join Free | My burrillandco.com | 
 | 
 
                    ... Harmonic test can be analyzed to 31 harmonics. 3. Support Three Methods, two table method, two experimental methods. 4. Do three-phase transformer no-load, load test, GDKF Transformer Load and No Load Loss ...
 
                    ... Harmonic test can be analyzed to 31 harmonics. 3. Support Three Methods, two table method, two experimental methods. 4. Do three-phase transformer no-load, load test, GDKF Transformer Load and No Load Loss ...
 
                    ... resistance testing of the transformer winding is a must...In general, to measure the transformer winding or large power output inductor equipment, the traditional electrical bridge method and pressure drop ...
 
                    ...Current Transformer With 1V ac signal output In electrical and electronic engineering, a Oscilloscope AC Clamp On Current Transformer is an electrical device having jaws which open to allow clamping around a...
 
                    ...Current Transformer Features: • Meet the standard IEC62053 and ANSI C12.20 • High accuracy class ,wide linearity • Superitor stability ,separate the external magneitc field interference • Measure the current...
 
                    ...Current Transformer Features: • Meet the standard IEC62053 and ANSI C12.20 • High accuracy class ,wide linearity • Superitor stability ,separate the external magneitc field interference • Measure the current...
 
                    ...Current Transformer For Motor Protection Features: • Low Cost • High accuracy class ,wide linearity • Superitor stability ,separate the external magneitc field interference • Measure the current directly • M...
 
                    ...Measuring ● Flexible Installation 2. Technical Parameters: Main Parameter Primary Current 10(100)A/10(60)A Secondary Current 4mA Class Accuracy 0.1 Wire Length 10cm/12cm(customized) Installation Flexible Ins...
 
                    ...Measuring ● Flexible Installation 2. Technical Parameters: Main Parameter Primary Current 10(100)A/10(60)A Secondary Current 4mA Class Accuracy 0.1 Wire Length 10cm/12cm(customized) Installation Flexible Ins...
 
                    ...: φ16mm Measurement range of 1mA to 200A AC Low phase shift for power measurement Output model: Lead output(2.5m) Isolated plastic case recognized according to UL94-V0 Small-size, compact ......
 
                    ... Electricity Taking, Energy Conversion, Electricity Measurement, Leakage Protection Saturation magnetic induction intensity (T):0.76T Belt thickness (mm):0.1mm Open-close installation current transformer sui...
 
                    ... Electricity Taking, Energy Conversion, Electricity Measurement, Leakage Protection Saturation magnetic induction intensity (T):0.76T Belt thickness (mm):0.1mm Open-close installation current transformer sui...
 
                    ... type: Current output type and voltage output type. Purpose: Used for current measurement, monitor and protection for AC motor,lighting equipment, air compressor etc. Technical parameters: Model:SCT-013-015 ...
 
                    ... type: Current output type and voltage output type. Purpose: Used for current measurement, monitor and protection for AC motor,lighting equipment, air compressor etc. Technical parameters: Model:SCT-013-015 ...
 
                    ...Current Transformer Error Tester on Site Product Description RS025-L field current transformer error tester adopts a recurrence method to measure the current transformer error, which facilitates metering dev...
 
                    ...Current and Potentional Transformer Test Set CT PT Analyzer Test for current transformer: Excitation curve and parameters test Turns ratio test Ratio and phase error test Polarity mark check Winding resistan...
 
                    Current and Potentional Transformer Test Instrument CT PT Analyzer Test for current transformer: Excitation curve and parameters test Turns ratio test Ratio and phase error test Polarity mark check Winding resi...
 
                    ... transformer and voltage transformer at rated burden and working burden in one time test. The tester can automatically evaluate the test results according to the selected standard to determine whether the tr...