| Sign In | Join Free | My burrillandco.com |
|
... performance. It can be used to manufacture foundation bolt, ploughshare, chimney, roof board, rivet, low carbon steel wire, thin plate, welding pipe, pull rod, hook, ......
... by many users. High pressure oil pump for various hole sizes and working conditions. Maximum rotation torque up to 5,500 N.m as option for foundation bolting and...
... by many users. High pressure oil pump for various hole sizes and working conditions. Maximum rotation torque up to 5,500 N.m as option for foundation bolting and anchoring, casing and...
Steel Structure Introduction 1. Type: Single slope, double slope, Multi-slope; Single-span, double-span, Multi-span; Single-floor, double-floor, Multi-floor; 2. Base: steel foundation bolts 3. Steel frame: Mate...
...: 5TON FREE STANDING HEIGHT: 30M (10pcs) MAST SECTION: 1.6*1.6*2.8M zoomlion mast section could offer foundation bolts and repainting them before delivery according to your requests. Could check the mechanis...
...: 12TON FREE STANDING HEIGHT: 60M (1+17pcs) MAST SECTION: 2*2*3M could offer foundation bolts or fixing angle and unlock it before delivery according to your request Model 7025 Tower Crane Working Radius (m)...
... TIP LOAD: 2.0TON MAXIMUM CAPACITY: 12TON FREE STANDING HEIGHT: 60M MAST SECTION: 2*2*3M L68 could offer foundation bolts or fixing angle and unlock it before delivery according to your request Model 7020 To...
...CAPACITY: 10TON FREE STANDING HEIGHT: 60M MAST SECTION: 2*2*3M L68 could offer foundation bolts or fixing angle and unlock it before delivery according to your request Model 7020 Tower Crane Working Radius (...
...: 70M TIP LOAD: 1.5TON MAXIMUM CAPACITY: 10TON FREE STANDING HEIGHT: 46M MAST SECTION: 1.8*1.8*2.8M could offer foundation bolts or fixing angle and unlock it before delivery according to your request Model ...
... Length H beam: 4000-15000mm Height 200-1200mm Size MOQ is 300 square meters Base Cement and steel foundation bolts Main frame H beam Material Q235B Q345B S235 S355 SS400 or others as buyers' requests Purlin...
... which is made from tubular steel pipe and some angle steel or flat steel plates as braces, connected by flanges, flat plates, bolts and nuts. A foundation with anchoring bolts is also required for fixing th...
... etc. Shape: conical, cylindrical or rectangular tube Installation: fixed bolts and nuts Composition: base, anchoring bolts and foundation, steel pole, decorative pieces, lights mountinig brackets, lifting c...
...Foundations with anchoring bolts frames 2, Lattice Tower sections 3, Connecting plates 4, Platforms (1-5 platforms) 5, Brackets for mountning antennas and other communication facilities. 6, Lightning rod 7, ...
...I type column. 2. The columns are connected with the foundation by pre-embedding anchor bolt. 3. The beams and beams are connected with high intensity bolts. 4. The envelop construction net is made of cold f...
... column. 2. The columns are connected with the foundation by pre-embedding anchor bolt. 3. The beams and beams are connected with high intensity bolts. 4. The envelop construction net is made of cold form C ...
... H section Steel, Steel Grade Q355B/Q235B Column & Beam Connection: High Strength Bolt Column & Foundation Connection: Pre-embedded Anchor Bolt Secondary Structure Roof Purlin & Wall Purlin: C-shape or Z-sha...
... Iso/ce Connection Method :The columns are connected with the foundation by pre-embedding anchor bolt The beams and columns, beams and beams are connected with high intensity bolts Construction Advantage:Cou...
... is Q345B, and the yield strength is 345Mpa. * The steel column is connected to the foundation through the embedded anchor bolts. * Beam and column, beam, and beam are connected with 10.9S high-strength bolt...
... made of welded H-style steel. 2. The columns are connected with the foundation by pre-embedding anchor bolt. 3. The beams and columns, beams and beams are connected with high intensity bolts. 4. The envelop...
...weeks after approval of drawings. Foundation and anchor bolts are cast parallel with finished, ready for the site bolting. Use of PEBs has the potential to drastically reduce the total construction time of t...