| Sign In | Join Free | My burrillandco.com |
|
... testing of the transformer winding is a must...In general, to measure the transformer winding or large power output inductor equipment, the traditional electrical bridge method and pressure drop method requ...
... testing of the transformer winding is a must...In general, to measure the transformer winding or large power output inductor equipment, the traditional electrical bridge method and pressure drop method requ...
.... It is integrated by oil cup for dielectric loss, temperature-control equipment, temperature sensor, test-bridge for dielectric loss, AC trial electrical source, standard capacitor, high resistance meter an...
...Volume Resistivity of insulating oil etc. It is integrated by oil cup for dielectric loss, temperature-control equipment, temperature sensor, test-bridge for dielectric loss, AC trial electrical source, stan...
... for mixing and reverses for discharging. The rated output capacity of this mixer is 0.50 cubic meter.The concrete mixer is widely used in building site, road and bridge project, and many other construction ...
... supermarket&shop signs,outline of building construction,bridge,streets decorative signs,playground,square ,Christmas-trees ornating,sculpture&figure designings and so on. Size : 16mm*25mm, Packing : 50m/rol...
... supermarket&shop signs,outline of building construction,bridge,streets decorative signs,playground,square ,Christmas-trees ornating,sculpture&figure designings and so on. Size : 16mm*25mm, Packing : 50m/rol...
... M900 Max load could be 32 tons and 50 tons Tip load is 11 tons. Jib length:70 meter Mechanisms are all frequency, they are 180LCC80,33DVF, 50 RVF, 37 TVF. Widely used for steel factory, power plant, bridge ...