| Sign In | Join Free | My burrillandco.com |
|
...Pipe Ramming Hammer Applicable Industries Mining Product Description Whatever direction your work takes you, BAIWEI can handle it... From conventional horizontal pipe ramming to vertical pile driving. The BA...
...Pipe Ductile Iron Wear Resistant For Steam Supply OVERVIEW This kind of pipe is able to bear huge jacking pressure. As well owns enough intensity to endure internal and external pressure. It also possesses p...
...Pipe Ductile Iron Wear Resistant For Steam Supply OVERVIEW This kind of pipe is able to bear huge jacking pressure. As well owns enough intensity to endure internal and external pressure. It also possesses p...
METAL Forged Steel Pipe Threadolet A182 F52 F53 F55 1" 2" 3" 4" 3000LB 6000LB 9000LB sturdy olet Threaded Connection: Threadolet uses a threaded connection method, which facilitates quick in...
...pipe beveling machine, pipe beveling machine, external clamp type automatic beveling machine. Product performance The external clamp beveling machine is designed for bevel processing of the end face of small...
...Pipe Clamp 1. Product detail : Standard of this clamp: clamp + sealing rubber ring. We choose 2.0mm plate for production. For connecting flanged metal pipes with a thickness of 2.0mm. Installation method: se...
...Pipe White Red Color Pn20 Kitchen Water Supply System Tube Description List MPA(Pressure) Size(mm) Thinckness(mm) PN2.0 20 2.8 25 3.5 32 4.4 40 5.5 50 6.9 63 8.7 75 10.3 90 12.3 110 15.1 Advantages 1.Long Se...
...Pipe White Red Color Pn20 Kitchen Water Supply System Tube Description List MPA(Pressure) Size(mm) Thinckness(mm) PN2.0 20 2.8 25 3.5 32 4.4 40 5.5 50 6.9 63 8.7 75 10.3 90 12.3 110 15.1 Advantages 1.Long Se...
...Pipe Clamps Dust Collection Ductwork Clamps Product Detail: Different from the sealing ring of the standard clamp. This seal wraps all around the metal ferrule. The sealing performance at both ends of the co...
... connection point between the pipeline and any other components in the system. One of the key advantages of using a Rubber Lined Pipe is its excellent corrosion resistance. The rubber coating provides a prot...
... long-lasting performance, making them an ideal choice for water supply systems. With an installation method that can be either trenchless or open trench, these HDPE water supply pipes offer flexibility in d...
...pipe connector Product introduction The installation method of right angle vertical metal joint is somewhat similar to that of T-type straight joint. It only need one pair of M6 * 25 bolts to complete the in...
...straight joint. It only need one pair of M6 * 25 bolts to complete the installation process. The surface of right angle vertical joint can be provided with holes to further drive self-tapping screws to stren...
...Pipe Ramming with Main Machine Length 1320-4640mm Product Description: Pipe Ramming: Faster, Minimal Disruption, High Accuracy Pipe Ramming is a trenchless technology used in underground construction to inst...
... Size Green PPR Pipe Fittings Tee With Easy Installation PPR Reducing Tee is used to divide the water flow into three ways. The socket welding method is connected with the fittings or pipes to facilitate ins...
... Size Green PPR Pipe Fittings Tee With Easy Installation PPR Reducing Tee is used to divide the water flow into three ways. The socket welding method is connected with the fittings or pipes to facilitate ins...
...PRODUCT PROFILE Dismantling joint is specially designed to provide an easy method of removing or installing any kind of flanged product in a pipeline, such as valves, pumps, flanged pipe fittings or other si...
... steel pipes quickly and efficiently. This method is ideal for engineering rescue and tamping casing in a variety of construction projects. Application Pipe Ramming is widely used in the construction industr...
... resistance is small, the flow flux is large, the foundation does not need to make the concrete foundation, the weight is light, the transportation installation is convenient, the construction is quick;The r...
...Pipe Heavy Duty Double Braided Exhaust Flex Pipe With Ends Extensions 2.0x4x8" Diameter (IN) : 2" Length (IN) : 8" Finish : Natural Color : Silver Material : Stainless Steel Mesh With Aluminized end tubing A...