| Sign In | Join Free | My burrillandco.com |
|
...Working weight of the entire machine (kg) 19400 Tonnage(Ton) 20 Cooling method water cooling Maximum excavation depth (mm) 6670 Engine model ISUZU AA-6BGIT Rated power (kw/rpm) 109.6/2100 Fuel tank (L) 360 T...
... width (mm) 600 Total length of transport (mm) 9680 Total transportation width (mm) 2980 Overall transport height (mm) 3440 Maximum excavation radius (mm)...
... and 2USB A +2USB C charge+wireless charger Product Size Diameter 120 mm* Height 280 mm Color White / Black /Grey Installation Method Embedded + Ring screw lock installation Customization Build in US / UK/ C...
... and 2USB A +2USB C charge+wireless charger Product Size Diameter 120 mm* Height 280 mm Color White / Black /Grey Installation Method Embedded + Ring screw lock installation Customization Build in US / UK/ C...
...Product Material Aluminum alloy Working Principle Electric lifting Configuration 3 power outlets and USB A +USB C charge+wireless charger Product Size Diameter 129.5 mm* Height 235 mm Color White / Black /Gr...
... and USB A +USB C charge+wireless charger Product Size Diameter 129.5 mm* Height 235 mm Color White / Black /Grey Installation Method Embedded + Ring screw lock installation Customization Build in US / UK/ C...
...Aluminum alloy Working Principle Damping hydraulic pop up Configuration 1*USB A+USB C, 4*EU power supply, Wireless charging Product Size Diameter: 129MM , Height: 266MM Cut Hole Size Diameter 120mm Color Bla...
... Aluminum alloy material Working Principle Damping hydraulic pop up Configuration 2*Universal power supply Panel Size 220*120MM Cut Hole Size Length: 220MM, Width: 120MM, Height: 60MM Color Black/Silver Inst...
...Height) Weight 0.1KG Power Supply & Communication Power supply Com. Method AC Powerwith AdapterDry Battery (4pcs AA LR61.5V Dry Battery) LoRa RF Wireless Com. Com. Distance 300-400m by LoRa RF Wireless Com. ...
...designed to safely and efficiently manage large cable and wire reels. This robust solution replaces dangerous manual methods with a powerful hydraulic pump system that lifts reels from ground level to secure...
... 1 pcs 1 polybag, 50pcs/carton Or as per requested. Sample rules: Prepare period: Free samples can be sent within 5 working days. Shipping mode: By DHL, UPS or as per requested. Sample payment method: freigh...
... adjustment) Main material: cold-rolled steel Length offer: 10/12/14/16/18/20/22" Height adjustment: 0-3mm Sample rules: Prepare period Free samples can be sent within 5 working days. Shipping method By DHL,...
... slide Main material: cold-rolled steel Length offer: 10/12/14/16/18/20/22" Height adjustment: 0-3mm Sample rules: Prepare period Free samples can be sent within 5 working days. Shipping method By DHL, UPS o...
... Information: Normally 1 pc 1 polybag, 50pcs/carton Or as per your requested Available: Table legs Sample rules: 1. Free samples can be sent within 5 working days. 2. Shipping method: By DHL, UPS...
... cabinet door/Tatami/Dresser etc Port of departure: Shenzhen, Guangzhou Sample Rules: Prepare period Free samples can be sent within 5 working days. Shipping method By DHL, UPS or as per your...
...height mm) Expand size: 1560 * 1370 * 490 (mm) (excluding paddle deployment) Maximum takeoff weight: 30kg Recommended load weight: 1~8kg Empty weight: 12kg Folding method: umbrella style downward folding Pro...
...Methods 1 Nominal Voltage 10.8V Follow 2 Nominal Capacity 2.5A Follow 3 Minimum Capacity 2.3A Follow 4 Battery internal Impedance Internal Impedance≤20mΩ, Internal Impedance Testing Machine(1kHz ) 5 Shipment...
...Methods 1 Nominal Voltage 10.8V Follow 2 Nominal Capacity 2.5AH Follow 3 Minimum Capacity 2.3AH Follow 4 Battery internal Impedance Internal Impedance≤20mΩ, Internal Impedance Testing Machine(1kHz ) 5 Shipme...
...Methods 1 Nominal Voltage 10.8V Follow 2 Nominal Capacity 2.5A Follow 3 Minimum Capacity 2.3A Follow 4 Battery internal Impedance Internal Impedance≤20mΩ, Internal Impedance Testing Machine(1kHz ) 5 Shipment...
...Methods 1 Nominal Voltage 10.8V Follow 2 Nominal Capacity 2.5Ah Follow 3 Minimum Capacity 2.3Ah Follow 4 Battery internal Impedance Internal Impedance≤20mΩ, Internal Impedance Testing Machine(1kHz ) 5 Shipme...