| Sign In | Join Free | My burrillandco.com |
|
...Beam Girder Overhead Bridge Crane Span 7.5m - 31.5m Capacity 1 Ton 2 Ton 3 Ton 5 Ton 10 Ton Description: Single Beam Overhead Crane is a kind of crane travelling along two parallel rails and lifting mechanis...
... hoist. It is a small and medium-sized crane with rail operation. Its applicable crane capacity is 3-32 tons, applicable span is 12-50 meters, and working environment is -20 ~ 40. ° C. This product is a gene...
... beam or other lifting tools. This model gantry crane is special designed for lifting and transfer bigger material which will allow the material pass through the legs. Rail mounted design, frequency inverter...
...Crane 10T 12.5T 13.5T Crane QL Model up rotation type hanging beam magnetic overhead traveling crane is one kind of heavy duty overhead crane, it is composed with Girder frame, Crane travel device, and the t...
... and metal structures. The external appearance of the bridge crane is a single-span slab bridge supported on two parallel overhead rails at both ends. The Single-beam bridge crane is an important tool and eq...
...Crane 10T 12.5T 13.5T Crane QL Model up rotation type hanging beam magnetic overhead traveling crane is one kind of heavy duty overhead crane, it is composed with Girder frame, Crane travel device, and the t...
... beam or other lifting tools. This model gantry crane is special designed for lifting and transfer bigger material which will allow the material pass through the legs. Rail mounted design, frequency inverter...
...Beam Bridge Overhead Crane 1-32 ton Description: Industrial Double Girder Beam Bridge Overhead Crane 1-32 ton is a general-purpose bridge crane of the trolley. The crane relies on the longitudinal movement a...
... hoist. It is a small and medium-sized crane with rail operation. Its applicable crane capacity is 3-32 tons, applicable span is 12-50 meters, and working environment is -20 ~ 40. ° C. This product is a gene...
...h a bridge or girder supported by a gantry that moves on ground rails at either end or one end. It can be used for lifting and moving materials in warehouses, freight yards or docks. Double girder gantry cra...
... bridge. In order to expand the scope of crane operation, the main girder can extend to one side or both sides to extend the leg to form a cantilever. It is used together with CD, MD and other models of elec...
.... When it comes to large span and lifting weight, we suggest the single girder gantry crane for ship building which is more economy. The single girder gantry crane for ship building is mainly composed of ste...
...crane workshop gantry crane Product Description customized shipping container crane workshop gantry crane is a kind of rail mounted crane used to offload, stack and load 20ft, 40ft, 45ft ISO standard contain...
...crane double girder gantry crane Product Description customized shipping container crane workshop gantry crane is a kind of rail mounted crane used to offload, stack and load 20ft, 40ft, 45ft ISO standard co...
...crane workshop gantry crane Product Description customized shipping container crane workshop gantry crane is a kind of rail mounted crane used to offload, stack and load 20ft, 40ft, 45ft ISO standard contain...
...crane double girder gantry crane Product Description customized shipping container crane workshop gantry crane is a kind of rail mounted crane used to offload, stack and load 20ft, 40ft, 45ft ISO standard co...
...Hoist High Speed And Low Noise For Beam Crane Electric chain hoist: The electric chain crane is a typical and unique optimized structure, which can shorten the distance between the body and the beam rail, an...
... device. There is pave the rail for the trolley moves on the main girder 2)Assembled the moving table on the outside of the two main girder,one side is prepare for assemble and maintenance the crane move dev...
... the trolley with lifting and moving device. There is pave the rail for the trolley moves on the main girder 2)Assembled the moving table on the outside of the two main girder,one side is prepare for assembl...
...lifting and moving device. There is pave the rail for the trolley moves on the main girder 2)Assembled the moving table on the outside of the two main girder,one side is prepare for assemble and maintenance ...