| Sign In | Join Free | My burrillandco.com |
|
...Height 7060mm Product Details Product Specification rotation speed 11.5rpm Place of Origin China Cooling method Water-cooling Packaging Details Container, Bulk Cargo Ship, Ro Ship Total length of track 2820m...
... abrasive grains, and the diamond abrasive grains are bonded to the substrate by a metal bonding agent. First deposit the metal bond to a thickness of 20% of the height of the diamond abrasive grains (sand),...
...electrochemical method. The working layer of the grinding wheel contains diamond abrasive grains, and the diamond abrasive is bonded to the substrate by a metal bonding agent. First, the thickness of the dep...
... Fuel tank (L) 120 Total length of transport (mm) 6060 Total transportation width (mm) 2060 Overall transport height (mm) 2470 Track shoe width (mm) 400 Walking speed (km/h) 2.5/4.5 Rotating speed (rpm) 9.3...
...Working weight of the entire machine (kg) 21200-21900 Tonnage(Ton) 21 Cooling method water cooling Maximum excavation depth (mm) 6700 Engine model Hino J05E Rated power (kw/rpm) 114/2000 Fuel tank (L) 370 To...
... Fuel tank (L) 247 Total length of transport (mm) 7599 Total transportation width (mm) 2175 Overall transport height (mm) 2175 Track shoe width (mm) 500 Rotation speed (rpm) 11 Walking speed (km/h) 2...
...Working weight of the entire machine (kg) 19900 Tonnage(Ton) 20 Cooling method water cooling Maximum excavation depth (mm) 6620 Engine model Komatsu SAA6D107E-1 Rated power (kw/rpm) 110/2200 Fuel tank (L) 40...
... Working Principle Damping hydraulic pop up Configuration 4 * UK+1*USB type A+1*USB type C charge+ Wireless phone charge Product Size Height 304mm, panel diameter 120mm, hole diameter 100mm Cut Hole Size 100...
... A+*2*USB type C charge+ Wireless charge Product Size Diameter 115 mm* Height 305 mm Color White/Black Installation Method Embedded + Ring screw lock installation Customization Build in US / UK/ CN/EU standa...
...Working weight of the entire machine (kg) 19900 Tonnage(Ton) 20 Cooling method water cooling Maximum excavation depth (mm) 6620 Engine model Komatsu SAA6D107E-1 Rated power (kw/rpm) 110/2200 Fuel tank (L) 40...
...Working weight of the entire machine (kg) 19900 Tonnage(Ton) 20 Cooling method water cooling Maximum excavation depth (mm) 6620 Engine model Komatsu SAA6D107E-1 Rated power (kw/rpm) 110/2200 Fuel tank (L) 40...
...Working weight of the entire machine (kg) 19900 Tonnage(Ton) 20 Cooling method water cooling Maximum excavation depth (mm) 6620 Engine model Komatsu SAA6D107E-1 Rated power (kw/rpm) 110/2200 Fuel tank (L) 40...
...Working weight of the entire machine (kg) 12600 Tonnage(Ton) 13 Cooling method water cooling Maximum excavation depth (mm) 5520 Engine model Komatsu SAA4D95LE-3 Rated power (kw/rpm) 66/2200 Fuel tank (L) 247...
...Height 8 Meters Method of Raising Manual Mast Section 3 Lights Bar Steering System 270° Manual Operation Mask Lifting System Vertical Mechanical Brake System Mechanical Brake Parking Dry Weight 700 kg LAMP T...
...Working weight of the entire machine (kg) 19900 Tonnage(Ton) 20 Cooling method water cooling Maximum excavation depth (mm) 6620 Engine model Komatsu SAA6D107E-1 Rated power (kw/rpm) 110/2200 Fuel tank (L) 40...
...Working weight of the entire machine (kg) 22570 Tonnage(Ton) 22 Cooling method water cooling Maximum excavation depth (mm) 6730 Engine model Cummins B5.9-C Rated power (kw/rpm) 112/1950 Fuel tank (L) 115 Tot...
... width (mm) 600 Total length of transport (mm) 9680 Total transportation width (mm) 2980 Overall transport height (mm) 3440 Maximum excavation radius (mm)...
...Working weight of the entire machine (kg) 19400 Tonnage(Ton) 20 Cooling method water cooling Maximum excavation depth (mm) 6670 Engine model ISUZU AA-6BGIT Rated power (kw/rpm) 109.6/2100 Fuel tank (L) 360 T...
... width (mm) 600 Total length of transport (mm) 9680 Total transportation width (mm) 2980 Overall transport height (mm) 3440 Maximum excavation radius (mm)...
... and 2USB A +2USB C charge+wireless charger Product Size Diameter 120 mm* Height 280 mm Color White / Black /Grey Installation Method Embedded + Ring screw lock installation Customization Build in US / UK/ C...